Chapter 1: Getting Started
|
9
ReadyNAS 3100 Hardware Manual
Choosing a Setup Location
Note:
This product is intended for installation in a restricted access
location, such as dedicated equipment rooms, service closets, and
so on.
Leave enough clearance in front of the rack so that the front door can open completely (about
25 inches), with approximately 30 inches of clearance in the back of the rack to allow for
sufficient airflow and ease in servicing.
Preparing for Setup
Read these instructions in their entirety before you begin. Locate the ReadyNAS 3100
shipping carton, remove the rack mounting kit, and prepare to work for installation.
Installing the System into a Rack
Follow these instructions for installing the system into a rack.
1.
The rack mounting kit contains two rail assemblies. Each assembly consists of two
sections:
•
An inner fixed chassis rail that secures directly to the ReadyNAS 3100 chassis.
•
An outer fixed rack rail that secures directly to the rack itself. Extend the rail assembly
by pulling it outward.
Press the release tab and separate the inner rail from the outer assembly.