Install Hardware
37
Heavy object. Two people are required to safely handle the server. Always ask for
assistance to install or remove the server.
11.Align the inner rail with the outer rail.
12.Horizontally install the system half way into the slide rail.
13.Press the release tab. Slide the server into the rails till flush with the rack.
14.Install and secure the thumb screw(s) to the system.
Figure 3.20. Aligning Rails
13
14
14
12
3.8.2. Installing a Cable Management Arm
Prerequisite:
Install the system to the rack cabinet. See Section 3.8.1, “Installing the Rack Brackets”.
1. Align the cable management arm with the rear of the chassis.
2. On the left side, install the outer member of the cable management arm into the rail assem-
bly.
3. On the right side, install the inner member of the cable management arm into the rail as-
sembly.
4. On the right side, install the outer member of the cable management arm into the rail as-
sembly.
Содержание Aeon J460 M2 JBOD
Страница 1: ...Netberg Aeon J460 M2 JBOD ...
Страница 2: ...Netberg Aeon J460 M2 JBOD ...
Страница 7: ...1 Chapter 1 Netberg Aeon J460 M2 JBOD ...
Страница 11: ...5 Chapter 2 About JBOD ...
Страница 25: ...19 Chapter 3 Install Hardware ...
Страница 34: ...Install Hardware 28 Figure 3 10 Installing PSU A B 1 2 ...
Страница 45: ...Install Hardware 39 Figure 3 23 Installing Cable Management Arm 2 3 7 Right Rear ...