Nera SatLink Terminal User Guide – Revision P
97
After polarisation adjustment.
The carriers have disappeared.
Tighten all the bolts and screws properly and have a final check on signal level and polarisation.
G.3.3 Additional work
The Rx- and Tx-cables should be strapped to the feed-mount.
Finally, the F-connectors must be protected against rain and humidity. Use a self-vulcanising tape suitable
for out-door use. The cables must also be properly marked.
Содержание SatLink 1000
Страница 1: ...Nera Broadband Satellite AS...
Страница 2: ......
Страница 3: ...Nera SatLink Terminal User Guide Revision P 1 Nera SatLink Terminal User Guide...
Страница 63: ...Nera SatLink Terminal User Guide Revision P 61 Figure 17 Statistics page...
Страница 66: ...Nera SatLink Terminal User Guide Revision P 64 Figure 19 Information concerning the current DHCP configuration...
Страница 74: ...Nera SatLink Terminal User Guide Revision P 72 Figure 24 Terminal line up web page...
Страница 84: ...Nera SatLink Terminal User Guide Revision P 82 Insert the remaining screws and tighten firmly with an Allen key...
Страница 100: ...Nera SatLink Terminal User Guide Revision P 98...
Страница 114: ...Nera SatLink Terminal User Guide Revision P 112 Figure 30 Dr TCP utility...