background image

INSTALLATION INSTRUCTIONS LL-3 (L-30N)

 

LIQUID LEVEL SWITCH 

 

MODEL L30N  LIQUID LEVEL SWITCH 

INSTALLATION AND OPERATING INSTRUCTIONS

 

 

Installation:

 

The L-30 liquid level switch is supplied with a 1-1/2” or 1-1/4” X 1 bushing threaded in place 
with 2 to 3 wraps of teflon tape, which must be intact or renewed if bushing and switch are 
separated before assembly in tank. Care must be exercised when threading the bushing 
into plastic or metal fittings. Apply a minimurn of 2 to a maximum of 3 wraps of teflon tape 
to threads of bushing - this is especially important if unit is to be used in metal fittings where 
coarse METAL THREADS could gall plastic if not lubricated. The plastic bushing CAN BE 
CRACKED if the main body of the flow switch is tightened into it FIRST. Cracking will not 
occur if the bushing is FIRST tightened into the pipe or tank fitting and THEN the L-30 body 
is tightened into the bushing.  
Thus: 

 

1). Teflon tape thread and tighten plastic bushing into pipe or tank fitting. 

 

2). Teflon tape thread and tighten L-30 switch into PLASTIC bushing by applying wrench to 
hexagon section. Repeat steps I and 2 until ARROW on body points to UPWARD and 
threads are, leak tight. 

 

Plumbers'tools such as pipe wrenches are not recommended. If possible use a "Ridgid" 
type wrench where the smooth jaws closely fit the hexagon section. 

 

Electrical Wiring:

 

1). Remove gland nut, grommet and switch cover. 

 

2). Strip outerjacket of electrical cord back 

 

3). Slip on terminals are  

     individual conductors supplied with each switch. approximately 1-1/4". Strip insulation 
from back approximately 1/4". Remove from switch terminals and 

     and crimp on or solder to electrical leads.  

4). Feed electrical cable through gland nut, grommet and switch cover as shown. 

 

 

 

Содержание G-100-1A

Страница 1: ...NEPTUNE GLYCOL FEED SYSTEM Models G 50 1 G 50 1A G 50 2A G 100 1A G 100 2A Lansdale PA 19446 Tel 215 699 8700 Fax 215 699 0370 REV NO 6 01 08 04 ZL106838 OPERATING INSTRUCTION MANUAL...

Страница 2: ...pm pump float switch and NEMA 4X control panel The control panel features a HAND OFF AUTO selector switch for the pump motor ON indication light for the pump LOW tank level indication light and power...

Страница 3: ...stop the pump The minimum differential pressure between the cut in and cut out set points is 10 psi and the maximum is 30 psi The float switch in the bottom of the tank will stop the pump if the glyc...

Страница 4: ...and the other in a clockwise rotation Looking at the front of the Model G XX 2A the control panel facing you the pump motor on the left should be wired counter clockwise and the pump motor on the rig...

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ...may be readily inspected in the field usually without removal from the drive or system plumbing Simply remove the cover screws to pull the cover Before attempting an inspection follow safety precauti...

Страница 9: ...positioned for easy cleaning access If start up screens are used be sure they are removed prior to placing the system into regular operation Orient lines so as to prevent formation of air pockets Be s...

Страница 10: ...ions require no adjustment If the pump s bearing areas or seal area runs hot shut the pump down and determine the cause For units equipped with integral pressure relief valve the factory setting is us...

Страница 11: ...inimum friction drag with positive sealing and again should be maintenance free provided the same conditions for mechanical seals are met as well as 6 Avoid scouring of the shaft in the lip seal area...

Страница 12: ...ut out 50 psi Differential 20 psi 50 30 psi Range The range is the pressure limits within which the operating points settings can be adjusted The range of the Class 9013 pressure switch is referenced...

Страница 13: ...st the operating points 1 Place a flat blade screwdriver in a range adjustment nut slot 2 Rotate the nut to the left to increase the operating points or to the right to decrease the operating set poin...

Страница 14: ...Cracking will not occur if the bushing is FIRST tightened into the pipe or tank fitting and THEN the L 30 body is tightened into the bushing Thus 1 Teflon tape thread and tighten plastic bushing into...

Страница 15: ...ation and thread gland nut firmly on to cover Fig 1 Wiring schematic for power applied to load when liquid level is less than set point power to load interrupted when level increases to above set poin...

Отзывы: