ORIG0019/A-17
4127763C/A
15/03/2006
17
Installation
1.10 Positioning the Receiving Tray
1.11 Filling the Moistener Reservoir
For safety, always disconnect the postage meter from the power
supply when filling the Moistener Reservoir.
Keep the postage meter top cover closed and take care not to spill
sealing solution/water onto the machine.
Open the reservoir compartment and fill with envelope sealing
solution or water.
Close the reservoir compartment.
Содержание IJ-40
Страница 4: ...4 ORIG0019 A 4 4127763C A 15 03 2006 ...
Страница 14: ...14 ORIG0019 A 14 4127763C A 15 03 2006 Installation 1 7 Fill the Label Dispenser Tab Printing Surface ...
Страница 22: ...22 ORIG0019 A 22 4127763C A 15 03 2006 Installation 55 50 45 40 80 75 70 65 60 ...
Страница 94: ...4127763C A 15 03 2006 ORIG0018 A 01 USER SGUIDE MAILING SYSTEM IJ 40 50 ...