6
4. INSTALLATION:_____________________________________________________________________________
4.1. Reactor Neolysis
®
Always install the Neolysis® system VERTICALLY on a solid and rigid surface (floor) as shown in the recommended installation diagram (Fig. 1). In
order to guarantee a good state of conservation, the Neolysis® system must be installed in a dry and well ventilated place at the engine room and
never should be installed outdoors.
Beware of corrosive atmosphere formation due to pH decreasing solutions (specially, those ones based on hydrochloric acid "HCl"). Do not install
the Neolysis® system near to any stores of these chemicals. We strongly recommend the use of chemicals based on sodium bisulphate or diluted
sulphuric acid.
The reactor of the Neolysis® systems is made within which is housed the UV lamp. The Neolysis® system should always be installed behind the
filtration system, and before any other device in the installation such as heat pumps, control systems, dosage systems, salt electrolysis systems,
etc.
The installation of the UV system should allow easy access to the UV lamp by the user. The location of the Neolysis® system must have an
effective height that allows the complete removal of the UV lamp from the sleeve (about twice the total height of the unit).
It is highly recommended to install the Neolysis® system in a place of the pipe that can be easily isolated from the rest of the installation by two
valves, so that the tasks of maintenance can be carried out with no need of partial or total draining of the swimming pool. Where the system is
installed on a by-pass (recommended option), a valve to regulate the flow must be introduced.
The water inlet should be provided at the bottom of the unit thus ensuring that the reactor is always flooded, and therefore, the lamp is completely
submerged.
4.2. Electrical installation
The Neolysis® system must be connected to the electrical control box of the pool, so that the pump and the Neolysis® system are turned on (and
off) simultaneously.
Remember
The equipment should be assembled and handled by truly qualified people.
Current electrical and accident prevention regulations should be followed.
Do not alter with the power supply to operate at another voltage different than that shown on the
label on the side of the unit.
Содержание NEO-12
Страница 2: ......
Страница 5: ...3 3 DATASHEET...
Страница 6: ...4...
Страница 7: ...5 Fig 1...
Страница 9: ...7 4 3 Electrical connections...
Страница 10: ...8...
Страница 14: ...12 4 7 Connection PoolStation...
Страница 18: ...16 Fig 23 System programming flow sheet...
Страница 29: ...27 7 1 3 REPLACEMENT AND CLEANING THE LAMP U V...
Страница 30: ...28...
Страница 31: ...29...