Nemalux RL Series Скачать руководство пользователя страница 5

Commissioning Cycle

Function test

Self-test

A tri-colour LED indicator displays the light fitting status. The indication colours are shown in 

table 1.

a. Commissioning Cycle

Starts automatically after 24 hours of uninterrupted charging. If there is a mains failure in this 

time the count resets for another 24 hours.

3 charge/discharge cycles to optimise battery’s full capacity.

Battery is charged for 24 hours before each discharge cycle.

No need for manual commissioning

b. Function Test

Carried out every 7 days.

Checks the function of the battery, lamp and power supply.

Lasts for few minutes only.

RL Intelligent Emergency Operation Guide

Operation

The light fitting will carry out the following function 

automatically

 after installation:

7.

All RL luminaires have terminal blocks suitable for looping 4mm2 cable, only one

cable should be connected to each terminal block connection

8.

The battery fuse is located in the compartment that contains the battery, the fuse is 

disconnected after final manufacturing testing. When installing the linear the battery fuse will 

need to be reconnected and the unit charged for 24 hours and then discharged (repeated 3 

times) to bring the battery up to peak capacity. (Unless an ‘EMX’ intelligent emergency variant 

– see notes below)

9.

If a 4 core cable is used on emergency luminaires – L1, L2, N and E the link cable at the front of 

the terminal block between L1 and L2 should be removed

10.

During emergency operation the light output and duration will be determined by the 

variant purchased

11.

Once wiring is complete replace terminal enclosure covers. Ensure gasket is located neatly in 

channel and no wires are trapped between cover and body. Tighten screws to 3Nm

12.

If carrying out Insulation Resistance tests the normal method of insulation testing is to 

connect Live and Neutral together and test between this point and Earth to prevent the 

risk of damage to the electronic control gear.

5

-

1

2

www.nemalux.com  |   [email protected]  |   Tel 403•242•7475  |   Fax 403•243•6190 

SUBJECT TO CHANGE WITHOUT NOTICE

MADE IN 

UK

Содержание RL Series

Страница 1: ...ct Nemalux for immediate assistance and advice Linear Range Installation Guide CML14ATEX3119 IEC Ex CML 15 0001 CML21UKEX3105 CML15ATEX4138 IEC Ex CML15 0068 CML21UKEX4104 CML16ATEX1130 IEC Ex CML16 0...

Страница 2: ...compound to screw threads such as PSU cover and external earth points During installation ensure exterior surface of the product is not in direct contact with a dissimilar metal such as galvanised st...

Страница 3: ...lux for further details The spigot mount version of the product is provided with a pole mount system and 2xM6 A4 SS Grub Screws for mounting onto 32 43mm diameter poles Once mounted tighten grub screw...

Страница 4: ...h the unit separately an internal and external earth point are provided as standard at each end of the luminaire 5 Connect wires to mains supply 6 If the unit is opened for any reason disconnect mains...

Страница 5: ...ated in the compartment that contains the battery the fuse is disconnectedafterfinalmanufacturingtesting Wheninstallingthelinearthebatteryfuse will need to be reconnected and the unit charged for 24 h...

Страница 6: ...arried out at a random time every 3 months Checks the battery s capacity and lamp s condition Performs self recovery for the battery if not at peak capacity Is carried out at 100 load Discharges only...

Страница 7: ...isolated connected when a hazardous environment is NOT present prior to carrying out any maintenance work 5 The unit has either 1 or 2 independent power supplies located in the terminal chamber covers...

Страница 8: ...Mains Frequency 50 60Hz Inrush Current Ipeak 50 20A t 300 s 28A t 300 s Total Harmonic Distortion 230Vac full load 10 IP Rating IP66 67 Weight std 6Kg 7Kg 9Kg 10Kg Dimensions See previous pages for l...

Страница 9: ...1 EM RL 2 STD RL 2 EM B 10A 11 10 5 4 B 16A 17 15 8 7 B 20A 25 22 12 11 B 25A 35 32 16 15 C 10A 24 20 11 10 C 16A 34 28 16 15 C 20A 49 44 23 20 C 25A 58 55 28 25 9 12 www nemalux com sales nemalux co...

Страница 10: ...80 C Db 40 C to 60 C Standard variants II 3 GD Ex ec mc IIC T4 Gc Ex tc IIIC T80 C Dc 40 C to 60 C Emergency variants II 2 GD Ex eb mb IIC T4 Gb Ex tb IIIC T76 C Db 20 C to 50 C Emergency variants II...

Страница 11: ...assessed by reference to the following standards EN 60079 0 2018 EN 60079 7 2015 A1 2018 EN 60079 31 2014 EN 60079 18 2015 A1 2017 And also 2014 35 EU Low Voltage Directive 2014 30 EU EMC Directive S...

Страница 12: ...2589 P 1 403 242 7475 F F 1 403 243 6190 E info nemalux com W www nemalux com Industrial LED Lighting designed to solve harsh and hazardous lighting challenges 12 12 www nemalux com sales nemalux com...

Отзывы: