10
OPERATING INSTRUCTIONS
Before filling hopper, become familiar with the operation of this spreader.
1- Move stop bolt on rate gauge assembly to the proper setting.
2- While pushing spreader forward, pull control lever back to stop bolts.
3- Top stop, push lever forward to close flow holes before you stop moving.
4- When finished, empty any remaining material from hopper.
5- Thoroughly wash spreader and allow to dry before storing.
6- No oiling is necessary.
7- Stay clear while spinner is turning.
Содержание CT2207
Страница 11: ...11 PARTS DRAWING...