background image

 

Page 1  

 

Doc. no#: 310-0050-001-002 R103 Manual

 

 

  

Foreword: 

The purpose of this document is to describe how to install and configure the Neets Control - ZULU. 

 

COPYRIGHT - 

All information contained in this manual is the intellectual property of and copyrighted material 

of Neets. All rights are reserved. You may not allow any third party access to content, information or data in 
this manual without Neets’ express written consent. 
 
 

CHANGES - 

Neets

 

reserve the right to change the specification and functions of this product without any 

notice. 

   

 
 
Questions, AFTER reading this manual, can be addressed to your local dealer or: 
 
 
 
 
Neets 
Langballe 4 
8700 Horsens 
Denmark 
 
by E-Mail

[email protected]

  

 
or you may use our contact form at 

www.neets.dk

  

 
 
 
Revision list: 

Author: Date 

Description 

Pages 

SDV 14/04-10 

First release. 

All 

SVL 16/09-10 

Added new case to fault finding section 

11 

DB 09/03-12 

New company address 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание Zulu

Страница 1: ......

Страница 2: ...t information or data in this manual without Neets express written consent CHANGES Neets reserve the right to change the specification and functions of this product without any notice Questions AFTER...

Страница 3: ...t 2 Description 3 Connections on units 4 Technical description 5 USB 5 Power output 5 Time Battery RTC 5 RS 232 Port 6 IR RS 232 ports 6 uSD Card 6 Switch and LED 7 I O Ports 7 LAN 7 Onboard relays 8...

Страница 4: ...s intelligence behind the scene The box itself is mounted over the ceiling and controlling the requested units through RS 232 IR LAN and I O Description Part number Neets Control ZULU 310 0050 RS 232...

Страница 5: ...DC out 2 Fuse to enable screen mode on RELAY 1 and RELAY 2 13 3 RS 232 port 4 RS 232 or IR control out 5 230 VAC power in 6 Relay connectors 7 LED and relay test button 8 Input Output 9 Mini USB 10 S...

Страница 6: ...so you do not have to connect 110 230 volt to the unit to program it BUT for long periods of testing testing your program it is recommended to connect 110 230 to the unit since the USB power is not ma...

Страница 7: ...PIN 2 Tx uSD Card The uSD Card is used to storage firmware homepage and the settings Under normal operation removal of the uSD Card is not needed If needed you can copy the settings and the firmware d...

Страница 8: ...d lock extra relays and so on The ports are not potential free that means you will need external relays if you need to prevent e g ground loops When used as output they are active low when the softwar...

Страница 9: ...ector and therefore you must not use the RELAY 1 and RELAY 2 connectors If you do not want to use the Screen connector please remove fuses F402 and F403 SCREEN FUSES 2 5AT Read the section Controlling...

Страница 10: ...e time 3 Dry contacts free to be used Cable in out of the box The Neets Control ZULU box comes with rubber globs This allows you to use any cable size you want and the taps inside the box gives you a...

Страница 11: ...wrong You need the return the unit to Neets or your dealer for replacement repair Unzipping config zip file after power on If you manual have placed a project file on the uSD card the system will extr...

Страница 12: ...LU has a log file which contains information warning and error that the system encounters during run The log file looks like below To give you the best support possible we recommend that you have acce...

Отзывы: