FlexPAK
11 Appendix A: Installation protocol
Copy the installation protocol, fill it in and save it as a service record.
For values, note the value in the result column, otherwise, a tick will suffice if the item has been performed or
considered.
NOTE!
If a value is outside the limit or a result is incorrect or missing, this is to be rectified before the initial
start-up and normal operation.
Correct limits or results are given within brackets.
Unit No.
Date:
Performed by:
Control items
Result
Application requirements (limits)
Material chemical/thermal reaction risk
Radiation heat from surroundings
Delivery checks
Missing components
Transport damage
Before installation
Foundation
Total weight (product, accessories, and collected material)
Anchor bolts
Access for maintenance/filter replacement (1 m above the unit)
Mounting (check availability)
Maintenance switch
Installation room, ventilation openings
Plastic bag
Duct system
PS cable (optional)
Start and control unit, terminals 3–4
Duct system
Duct dimensioning/transport velocity, check the performance
Electrical installation
30
Содержание FlexPAK Standard
Страница 6: ...FlexPAK 13 12 10 9 7 8 2 1 3 4 6 5 11 3 11 7 8 9 12 13 15 14 18 19 10 17 4 16 15 20 5 6...
Страница 7: ...FlexPAK 6 1 2 3 6 7 8 9 16 15 14 13 11 10 12 4 5 7 7...
Страница 9: ...FlexPAK 2 1 4 5 6 8 7 9 3 9 1 1643 1mm 65 662 1mm 26 2 1771 4 1mm 70 13mm 10 9...
Страница 10: ...FlexPAK 11 12 13 14 10...
Страница 11: ...FlexPAK 15 A B 16 11...
Страница 12: ...FlexPAK A B C 4x 17 8x 18 12...
Страница 13: ...FlexPAK A 4x B 19 Min 2 1m 83 20 1 0m 39 4 21 13...
Страница 14: ...FlexPAK A B C 22 23 14...
Страница 29: ...FlexPAK SUV Solenoid upper valve TVFD Twin valve feed out device 29...
Страница 34: ...www nederman com...