C 25
24
6. Earth control measurement (page 9)
GND - Filter unit
GND - Door
GND - Dust container
GND - Filter cartridges (only antistatic)
4. Duct dimensioning (page 10)
A.
Duct diameters
B.
Inlet duct
C.
Cleaning access covers
D.
Fire damper
E.
After cleaning damper
F.
Flow meter
G.
Extraction arms
7. Monitoring system, settings (p. 12-13)
A.
Cleaning during operation
B.
Pause time setting
C.
Cleaning after operation
D.
Alarm function
E.
Remote control
F.
ΔP-control
INSTALLATION PROTOCOL, PAGE 2
Result Result Result Note
Control points
FilterMax C 25 No.
Performed by
Date