Nedap PowerRouter Скачать руководство пользователя страница 15

EN

15

Appendix A   Warranty

PowerRouter factory warranty conditions

Our quality control program ensures that each PowerRouter product is manufactured to exact specifications and is thoroughly tested before 
leaving the factory.

5 year warranty

The Nedap factory warranty period is 5 years as from the purchase date of the PowerRouter system. The warranty conditions are based on 
the European EU directive no. 99/44/EG. The legal rights are applied for unimpeded.

Extended warranty

For all PowerRouter systems you can acquire an extension of 5 years on the PowerRouter factory warranty, up to a total of 10 years 
warranty. The warranty is only available if purchased within 6 months of the PowerRouter delivery date.

Warranty conditions

If a PowerRouter becomes defective during the relevant PowerRouter warranty period, one of the following services, as selected by the 
PowerRouter helpdesk, will be performed at no charge for materials, exclusive of labor costs:
• 

Repair at Nedap N.V., or

• 

Repair on-site, or

• 

Exchange for a replacement unit (of equivalent value according to model and age)

Exclusion of liability

Warranty claims and liability for direct or indirect damage are excluded if arising from:
• 

Transport and storage damage

• 

Incorrect installation and/or commissioning

• 

Modifications, changes or attempted repairs by untrained and unauthorized personnel

• 

Incorrect use or inappropriate operation

• 

Insufficient ventilation of the unit

• 

Failure to observe the applicable safety regulations

• 

Force majeure (e.g. lightning, overvoltage, storm, fire)

• 

Cosmetic shortcomings which do not influence the functioning of the unit

• 

Damage due to moisture and/or other environmental conditions

The installer/dealer who installed the PowerRouter must report the defective PowerRouter system to the PowerRouter Helpdesk.
Nedap reserves the right to replace the unit with an equal or better specification according to Nedap's judgement.

Disclaimer

All rights to the content of this manual are owned by N.V. Nederlandsche Apparatenfabriek “Nedap” (hereinafter Nedap). By using this 
manual you accept the terms of this disclaimer.
Nedap has made every effort to ensure that this manual is accurate. Nedap disclaims liability for any inaccuracies or omissions that may 
have occurred and for any damages arising from or related to the use of this manual.

No published data in this manual may be reproduced or published in any form or by any means without prior written consent by Nedap. 
Information in this manual is subject to change without notice and does not represent any commitment on the part of Nedap. Nedap makes 
no commitment to update or keep current the information in this manual, and reserves the right to make improvements to this manual and/
or to the products described in this manual, at any time without notice. If you find information in this manual that is incorrect, misleading, or 
incomplete, we would appreciate your comments and suggestions.

i

Содержание PowerRouter

Страница 1: ...the PowerRouter PowerRouter Solar Battery Installation Manual...

Страница 2: ...tandby 1 2 3 4 x 4 x 2 x 2 x 4 5 6 Standby Standby Standby Standby Standby Standby Standby Standby min 300 mm min 800 mm Max 40 C Min 10 C i 20 KG A A A A A B B Drill template for the PowerRouter Dril...

Страница 3: ...C LOCAL OUT AC GRID USB ETHERNET RJ45 CAN BUS CAN NO NO NC NC AC GRID AC LOCAL OUT 2 1 internet router PC laptop Mac to the router Cat5 network cable of a suitable length the PowerRouter to the router...

Страница 4: ...Settings menu Service menu Status menu System Reset Selftest Errors Install Wizard Display Date Time Language Battery Solar Grid Battery Solar Grid Internet connections 13 14 YES NO ON OFF Operationa...

Страница 5: ...te 20 Manuel d installation Page 34 Installatie handleiding Bladzijde 48 Manuale d installazione Pagina 62 Manual de instalaci n P gina 76 Manual de instala o P gina 90 N V Nederlandsche Apparatenfabr...

Страница 6: ...formation that you should know and use to ensure optimal operation of the system A bullet with a number refers to an illustration with the same number For illustrations refer to pages 2 4 Contents To...

Страница 7: ...e into account the following guidelines cautions and warnings when choosing a mounting location for the PowerRouter The PowerRouter is designed for indoor installations IP21 Do not install the PowerRo...

Страница 8: ...n in a safe and efficient manner follow the steps in the right order Before wiring the PowerRouter make sure that all wires connected to the PowerRouter are not live by turning off all disconnects and...

Страница 9: ...PowerRouter Read the label on the battery Battery charging stations must be located in designated battery charging areas This is because of the dangers of hydrogen gas and battery acid Do not smoke or...

Страница 10: ...e with the install wizard and installation software tool see also clause 6 2 The left contacts can be used for grid alarms the right contacts can be used for battery alarms 5 Commissioning This chapte...

Страница 11: ...or the end user depending on the configuration The restart duration is less than 1 minute Reset procedure 1 Enter the service menu 2 Select Reset 3 Press YES to continue 4 Press YES to start the Reset...

Страница 12: ...ill not be used if fixed float charge characteristic is set 28 8 V when 3 stage is set 28 0 V 30 0 V Low battery alarm ON Low battery alarm relay will be activated if battery voltage falls below set v...

Страница 13: ...outer to clear the error Also the error message can be cleared using the installation software tool or via the internet Clear error message procedure 1 Press NO for at least 3 seconds Troubleshooting...

Страница 14: ...d in Appendix D Solar 8 Disconnect AC wiring Grid Load The PowerRouter can now be removed for disposal or repair Decommissioning should only be carried out by certified persons Contact your installer...

Страница 15: ...or inappropriate operation insufficient ventilation of the unit failure to observe the applicable safety regulations force majeure e g lightning overvoltage storm fire cosmetic shortcomings which do...

Страница 16: ...isconnects loads B004 S Battery temperature too high measured by the external temperature sensor Check ambient temperature of battery storage room Provide sufficient cooling B005 S Battery temperature...

Страница 17: ...upply voltages out of range D029 S Cold start failed D011 S Load voltage too low Check grid voltage D012 S Load voltage too high D013 H Load short circuit Check load D023 H Current overload Disconnect...

Страница 18: ...anti islanding regulations electronic fused 6W interactive display with 4 button operation ethernet RJ45 TCP IP 1 second PR50SB BU PR37SB BU PR30SB BU 5 5 kWp and 15 A per string 4 kWp and 15 A per st...

Страница 19: ...n the connector locking mechanism PV disconnection procedure 1 Insert PV MS tool with the pins to the connector 2 Pull the PV connector out of the PowerRouter This tool is not delivered with the Power...

Страница 20: ...nformationen zu finden die f r einen optimalen Betrieb der Anlage anzuwenden sind Ein nummeriertes Aufz hlungszeichen weist auf eine Abbildung mit derselben Nummer hin Die Abbildungen befinden sich au...

Отзывы: