![background image](http://html1.mh-extra.com/html/nec/univerge-sl2100/univerge-sl2100_hardware-manual_3916628141.webp)
System Start Up
S
ECTION
1 SYSTEM START UP
1.1 Before Starting Up the System
Before starting up the system, make sure:
• Chassis are installed correctly.
• All extensions are cabled correctly.
• All earth ground and PSTN Trunks are cabled correctly.
• All boards are configured, equipped, and secured correctly.
• AC power cord is cabled correctly.
• At least one display type Multiline Telephone is connected to the system. (for Programming)
• If Expansion Chassis are installed, turn the power on/off in the order of Expansion 2 Chassis,
Expansion 1 Chassis and then Main Chassis.
1.2 Starting Up the System
There are two methods for startup (COLD Start and HOT Start).
Table 3-1 Start Up Method
Start Up Method
Description
Purpose
COLD Start
The factory setting data is loaded.
• First time start up
• System Initialization
HOT Start
The customer setting data is loaded.
• System Reboot
1.2.1 Perform a Cold Start
This section describes the process for starting the system for the first time or starting a system that
requires the customer data be deleted.
System software is loaded from flash memory, and the customer data is deleted
from RAM memory.
If Expansion Chassis are installed, turn the power on/off in the order of
Expansion 2 Chassis, Expansion 1 Chassis and then Main Chassis.
To perform a Cold Start;
Hardware Manual
3-1
System Start Up
3
Содержание UNIVERGE SL2100
Страница 1: ...Hardware Manual GVT 010793 201 00 EU ISSUE 1 0 May 2017...
Страница 14: ...MEMO SL2100 ISSUE 1 0 xii Hardware Manual...
Страница 20: ...MEMO SL2100 ISSUE 1 0 R 6 PRODUCT LIABILITY...
Страница 24: ...MEMO SL2100 ISSUE 1 0 R 4 Regulatory...
Страница 164: ...MEMO SL2100 ISSUE 1 0 4 16 Maintenance...
Страница 173: ...MEMO ISSUE 1 0 SL2100 Hardware Manual 5 9...
Страница 174: ...Hardware Manual NEC Corporation ISSUE 1 0...