Step 2: Install the server in 19-inch rack
1.
The figure shows the positions on which the rails and core nuts are installed. Install the core
nuts at the points identified by the figure.
Cable arm mount position
BACK
Core nut mount position
Core nut mount position
4U
FRONT
Slide rail mount position
Slide rail mount position
2.
Loosen the four fixing screws on the bracket for rear side to allow you to adjust the length of
guide rail (both rail assemblies).
Bracket for rear side
Fixing screws
Sliding rail
Outer rail
7
Содержание N8143-93
Страница 1: ...N8143 93 19 3 2 856 180253 001 2...
Страница 2: ...2 8 4 1 11 12 7 3 10 9 6 5...
Страница 3: ...1 1 2 1 3 1 4 1 1 700 743mm 5 2 1 743 900mm 6 1 7 10 8 10 9 10 M5 10 5 M4 11 8 M4 12 1...
Страница 4: ...1 1 2 4...
Страница 5: ...3 2 4 4...
Страница 6: ...5 4...
Страница 7: ...2 19 1 19 12 BACK 4U FRONT 2 3 2...
Страница 8: ...3 8 2 4 2 6...
Страница 9: ...5 19 2...
Страница 10: ...4 1 L 3 1 1 2 2 1 L 1...
Страница 11: ...743 900 700 743 3 19...
Страница 12: ...4 1 2 SA 3 3...
Страница 13: ...3...
Страница 14: ...1 2 3 4 1...
Страница 15: ...1 2 3 4 5 4 N8143 93 856 180253 001 2...