2. Installation and Connection
Chapter 2 Preparations
8. Insert the chassis from the front side of the tower conversion kit.
Note
Push the chassis to the end of tower conversion kit.
9. Fix each 2 places, top and bottom on the front side (total: 4) with 4 pan-head screws attached to the
device.
Express5800/R320c-E4, R320c-M4, R320d-E4, R320d-M4 User's Guide
74
Содержание Express5800/R320d-M4 Series
Страница 25: ...CAUTION 44U Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 25...
Страница 26: ...WARNING CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 26...
Страница 27: ...WARNING CAUTION CPU IO 18Kg 2 bezel bezel Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 27...
Страница 28: ...CAUTION NEC Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 28...
Страница 29: ...WARNING CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 29...
Страница 30: ...CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 30...