2. Installation and Connection
Chapter 2 Preparations
2.3.2
Installing the Rack-mount Model to the Tower Conversion Kit
Follow the procedure below to install the devices to the tower conversion kit.
CAUTION
Be sure to observe the following precautions to use the server safely. Failure to
observe the precautions may cause burns, injury, and property damage. For
details, see Safety precautions in Precautions for Use.
•
Do not drop the server.
•
4U chassis weighs about 10 kgs. At least two persons are required to install
it.
•
CPU/IO module weighs about 18 kgs. At least two persons are required to
install it.
•
Do not leave the CPU/IO module of the server being pulled out.
•
Do not install the CPU/IO module with its cover removed.
•
Do not get your fingers caught.
1. Open the front door of the tower conversion kit.
Note
If the door is locked, use the provided security key to unlock.
Express5800/R320c-E4, R320c-M4, R320d-E4, R320d-M4 User's Guide
72
Содержание Express5800/R320d-M4 Series
Страница 25: ...CAUTION 44U Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 25...
Страница 26: ...WARNING CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 26...
Страница 27: ...WARNING CAUTION CPU IO 18Kg 2 bezel bezel Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 27...
Страница 28: ...CAUTION NEC Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 28...
Страница 29: ...WARNING CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 29...
Страница 30: ...CAUTION Express5800 R320c E4 R320c M4 R320d E4 R320d M4 User s Guide 30...