1. Installing Internal Optional Devices
Express5800/GT110d-S User’s Guide
62
Chapter 2 Preparations
Installing the battery in the server
This section describes how to install this product in the server. Note that the installation position and
procedure differ for 2.5-inch Hard Disk Drive models and 3.5-inch Hard Disk Drive models.
Getting ready to install the battery
(1) Refer
to
Chapter 2 (1.3 Overview of Installation and Removal)
for preparations.
(2) While referring to
Chapter 2 (1.4 Removing the Side Cover
and
1.5 Removing the Front Bezel
,
remove the side cover and front bezel.
(3) If a RAID Controller is installed, remove the center bar to disconnect the internal SAS cable and
remove the RAID Controller. For details, refer to
Chapter 2 (1.10 PCI Card)
.
Installing the connector board
This section describes how to install the connector board to RAID Controller N8103-129/130.
(1) Securely connect the connector board to the connector of the RAID Controller and screw it with
the attached screw (small) at the rear of the RAID Controller.
Start
Preparation for installation
Connecting to RAID Controller
Finish
Installing the battery pack
in the 2.5-inch Hard Disk Drive model
Installing the battery pack
in the 3.5-inch Hard Disk Drive model
Installing the connector board