3-8 Setting Up Your Server
2.
While pushing the unlock button on the front of the server, hold the rails and slowly move
them toward the rear of the server.
3.
After a while, the rails are locked with clicking sound. Pull the release levers on the left
and right sides of the server toward direction indicated by an arrow (white) in the figure,
and remove them from the server while unlocking it.
4.
Only the inner rails remain screwed to the server when the rail assemblies have been
removed.
Press this button to
unlock the server.
Pull the release lever toward the
direction shown by the arrow
(white) to remove the rail.
Inner rail
Содержание Express5800/110Ri-1
Страница 16: ...x This page is intentionally left blank ...
Страница 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Страница 172: ...5 36 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 181: ...Installing and Using Utilities 6 9 4 Click Parameter File Creator Parameter File Creator will appear ...
Страница 194: ...6 22 Installing and Using Utilities This page is intentionally left blank ...
Страница 206: ...7 12 Maintenance This page is intentionally left blank ...
Страница 284: ...9 36 Upgrading Your Server This page is intentionally left blank ...
Страница 286: ...A 2 Specifications This page is intentionally left blank ...
Страница 294: ...C 2 IRQ This page is intentionally left blank ...
Страница 348: ...F 2 Using a Client Computer Which Has a CD Drive This page is intentionally left blank ...
Страница 352: ...G 4 Product Configuration Record Table This page is intentionally left blank ...