Chapter 6
Installing Internal Optional Devices
PREPARING FOR INSTALLATION AND REMOVAL
Follow the procedure below to prepare for installing or removing components.
a.
Shut down the OS.
b.
Press the POWER switch to power off the NEC Express server (the POWER lamp goes
off).
c.
Unplug the power cord of the NEC Express server from a power outlet.
The power cord appended to
the server as standard.
The power cord appended to
the extension power unit.
d.
Remove all cables from the rear of the NEC Express server.
e.
A clearance of one to two meters must be provided around and over the NEC Express
server.
Содержание Express 120Mf
Страница 1: ... EXPRESS5800 120Mf S e r v i c e G u i d e ...
Страница 2: ......
Страница 23: ...3 3 Unit Configuration ...
Страница 24: ...3 4 Unit Configuration CABLE CONNECTION LIST ...
Страница 36: ...4 12 Troubleshooting ...
Страница 38: ...5 2 Preventive Maintenance ...
Страница 62: ...6 24 Installing Optional Internal Devices ...
Страница 66: ...8 2 Notes ...
Страница 67: ...xx ...
Страница 68: ... ...