DS1000/2000 Correspondence Course
DS1000 System Installation
NEC America
DS1000/2000 Workbook
◆
55
❏
Power-up the system.
1. Make sure the system is properly grounded.
2. Install a surge protector in the AC outlet.
3. Plug the main cabinet’s AC power cord into its surge protector.
4. Turn on the cabinet’s power switch.
After a brief interval, the system will start and the power LED will
flash slowly (green).
Power Switch
80200 -28
8
0
2
0
0
- 1
4
Power LED
Содержание DS1000
Страница 2: ......
Страница 18: ...DS1000 2000 Correspondence Course Using Your Telephone 18 DS1000 2000 Workbook NEC America For Your Notes...
Страница 26: ...DS1000 2000 Correspondence Course System Configuration 26 DS1000 2000 Workbook NEC America For Your Notes...
Страница 30: ...DS1000 2000 Correspondence Course System Capacities 30 DS1000 2000 Workbook NEC America For Your Notes...
Страница 32: ...DS1000 2000 Correspondence Course DS1000 System Hardware 32 DS1000 2000 Workbook NEC America For Your Notes...
Страница 40: ...DS1000 2000 Correspondence Course DS2000 System Hardware 40 DS1000 2000 Workbook NEC America For Your Notes...
Страница 44: ...DS1000 2000 Correspondence Course System Installation 44 DS1000 2000 Workbook NEC America For Your Notes...
Страница 76: ...DS1000 2000 Correspondence Course DS1000 System Installation 76 DS1000 2000 Workbook NEC America For Your Notes...
Страница 146: ...DS1000 2000 Correspondence Course System Programming 146 DS1000 2000 Workbook NEC America For Your Notes...
Страница 170: ...DS1000 2000 Correspondence Course System Programming 170 DS1000 2000 Workbook NEC America For Your Notes...
Страница 174: ......