Installation Instructions
When installing a RealScan 7883, it is recommended that you first mount the Power Supply and run all the cables. After
connecting the unit to the host terminal, make any necessary programming changes and scan some good tags to verify that
the scanner is communicating with the host terminal. After verifying that everything is working correctly, mount the unit
in the checkstand. If the RealScan 7883 does not work properly, refer to the problem correcting section in this document:
Correcting Scanner Problems
.
The following flowchart shows the sequence of installation steps. Detailed descriptions of each step follow.
19762
Installing Power Supply and
Interface Cables
Step 1
Step 2
Step 3
Step 4
Setting Program Parameters and
Verifying Host Connection
Setting the Scan Zone