![NCR 7350-K160 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/ncr/7350-k160/7350-k160_kit-instructions_3732513039.webp)
7350 3-Bag Bagwell Upgrade
1-35
Routing Cables
To route cables when installing a new Bagwell follow these steps:
Note:
If a new Bagwell is installed to a No-Bag unit, refer to
on page 38 first for additional steps.
Note:
Use the new pre-installed USB Power Cable only when installing a new Bagwell
to a No-Bag unit. If not, reuse the existing USB Power Cable of the previous Bagwell.
1. Retrieve the USB Power Cable from the Core and route to the Scale Controller
through the smaller opening of the Bagwell frame as shown in the image below.
Содержание 7350-K160
Страница 1: ...Kit Instructions 3 Bag Bagwell Upgrade 7350 K160 K162 K164 K165 K966 Issue C...
Страница 4: ...1 4...