![NCR 7350-K160 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/ncr/7350-k160/7350-k160_kit-instructions_3732513021.webp)
7350 3-Bag Bagwell Upgrade
1-17
b. Loosen the two (2) upper screws, but do not remove.
c. Lift Bagwell up and away from Core. The upper screw heads will pass through
the key holes in the Bagwell side support.
Note:
The two (2) upper screws may be left in place if a new Bagwell will be
installed in the same orientation. Otherwise, remove the screws from the side of
the Core.
Содержание 7350-K160
Страница 1: ...Kit Instructions 3 Bag Bagwell Upgrade 7350 K160 K162 K164 K165 K966 Issue C...
Страница 4: ...1 4...