![NCR 7350-K160 Скачать руководство пользователя страница 36](http://html1.mh-extra.com/html/ncr/7350-k160/7350-k160_kit-instructions_3732513036.webp)
1-32
7350 3-Bag Bagwell Upgrade
13. Install clear plastic deflectors to the Core side and rear side of the Bagwell.
Ensure that the deflectors meet at the rear and Core side corners, and should rest
against the Bagwell frame.
! Important:
Plastic deflectors must
not
touch the Scale Tray surface to avoid
scale errors.
14. Attach the Bagwell Skirt Panels. For more information, refer to
15. Do the following:
•
Level the unit and attach the bag racks, if necessary. For more information, refer
to the 7350 NCR SelfServ™ Checkout (7350) Hardware Installation Guide (B005–
0000–1826).
•
Test scale operation in PML. For more information, refer to the NCR FastLane
SelfServ™ Checkout Profile Manager Lite (PML) User Guide for ADD 3.X (B005-
0000-2279).
Содержание 7350-K160
Страница 1: ...Kit Instructions 3 Bag Bagwell Upgrade 7350 K160 K162 K164 K165 K966 Issue C...
Страница 4: ...1 4...