background image

BIM 1009/2007/09 

 

Page 2 of 8 

www.nord.com 

Couplings for the NEMA and IEC Adapters 

Depending on the size of the input adapter to the gearbox, NORD Gear supplies two styles of couplings - BoWex

“

 (gear tooth) and Rotex

“

(jaw) couplings.

BoWex

“

 Couplings 

NORD C-face adapter input shafts have a machined spline on the end.  NORD incorporates two styles of BoWex

“

 couplings, the “J” and “M” 

styles.  The “J” style is a one-piece coupling with a metal hub and nylon spline.  The “M” style is a two-piece coupling – the metal hub and a 
nylon sleeve.  Nylon and steel components allow them to operate in high ambient temperatures without lubrication or maintenance.

x

 

Nylon sleeves resist dirt, moisture, most chemicals and petroleum products 

x

 

No lubrication required 

x

 

Operating Conditions: -22

q

F - 195

q

F (-30

q

C - 90

q

C) 

x

 

Higher temperature coupling sleeve available up to 250

q

F (120

q

C) 

x

 

Special bore available 

BoWex

“

 Mechanical Ratings 

“J” Style 

“M” Style 

Coupling 

Type 

Available 

Bore Sizes 

Cont. /  Peak 

Torque 

Input 

Coupling 

Type 

Available 

Bore Sizes 

Cont. /  Peak 

Torque 

Input 

J14

11, 14 mm 

5/8 in. 

10 / 20 Nm 

89 / 177 lb-in 

IEC 63, 71 
NEMA 56C 

M14/M24/M28

Same as 

“J” style 

Same as 

“J” style 

Same as 
“J” style 

J24

19, 24 mm 

5/8, 7/8 in 

20 / 40 Nm 

177 / 354 lb-in 

IEC 80, 90 
NEMA 56C,140TC 

M38

38 mm 

1-1/8, 1-3/8 in. 

80 / 160 Nm 

708 / 1,416 lb-in 

IEC 132 
NEMA 180TC, 
210TC

J28

28mm

1-1/8 in 

45 / 90 Nm 

399 / 797 lb-in 

IEC 100, 112 
NEMA 180TC 

M42

42 mm 

1-5/8 in 

100 / 200 Nm 

885 / 1,770 lb-in 

IEC 160 
NEMA 250TC 

M48

48 mm 

1-7/8 in 

140 / 280 Nm 

1240 / 2,478 lb-in 

IEC 180 
NEMA 280TC 

Rotex

“

 Couplings 

The cast iron jaw type couplings have an integral urethane “spider” that 
provides smooth transmission of the motor torque.  A set screw on the 
coupling prohibits axial movement along the motor shaft. 

x

 

Excellent shock and vibration dampening 

x

 

Excellent resistance to oils and most chemicals 

x

 

No metal-to-metal contact 

x

 

Operating Conditions:  -40

q

F - 195

q

F (-40

q

C - 90

q

C)

x

 

Higher temperature material (Hytrel) spider available up to 230

q

F

(110

q

C) 

x

 

Special bores available 

Hub Design 1 Spider 

Hub Design 1a

Rotex

“

 Mechanical Ratings   

Coupling 

Type 

Available 

Bore Sizes 

Continuous / Peak 

Torque 

Inputs Used With 

Spider

R19 

14, 19 mm 

17 / 34 Nm 

150 / 300 lb-in 

SEK/SEP 100 

R24 

19, 24 mm 

60 / 120 Nm 

530 / 1,060 lb-in 

SEK/SEP 100, 130 

Urethane

98 Shore A Hardness 

Color: Red 

R28 

32, 38 mm 

95 / 190 Nm 

840 / 1,680 lb-in 

SEK/SEP 165, 215 

R38

1.89” (48mm) 

Max Bore 

190 / 382 Nm 

1,680 / 3,380 lb-in 

-

R42

2.44” (62mm) 

Max Bore 

310 / 620 Nm 

2,740 / 5,480 lb-in 

-

R48

42, 48 mm 

1-5/8, 1-7/8 in 

310 / 620 Nm 

2,740 / 5,485 lb-in 

IEC 160, 180 

NEMA 250T, 280T 

SEK/SEP 300, 215 

R65

60 mm 

2-1/8, 2-3/8 in 

625 / 1,250 Nm 

5,530 / 11,060 lb-in 

IEC 225 

NEMA 320T, 360T 

R90

65, 75, 80 mm 

2-1/8, 2-3/8 in 

2,400 / 4,800 Nm 

21,240 / 42,480 lb-in 

IEC 250, 280, 315 

NEMA 360T, 400TS, 440TS 

Urethane

92 Shore A Hardness 

Color: Yellow 

Содержание 150644

Страница 1: ...OPERATION AND MAINTENANCE MANUAL SERIAL NUMBER ___________________ CUSTOMER ____________________________ SALES REP ____________________________ BTR SERIES 150644...

Страница 2: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...

Страница 3: ...ER J MINIMUM HARDWARE CLEARANCE REQUIRED IN MOUNTING STRUCTURE NOTES BASIC WEIGHT DOES NOT 1 INCLUDE SHAFT IMPELLERS OR MOTOR ALL DIMENSIONS ARE IN INCHES 2 2018 DATE DIMENSION AND ASSEMBLY DRAWING AP...

Страница 4: ......

Страница 5: ...ALUE IN THE O M MANUAL 3 ATTACH THE GUARD ITEM 2 ON THE TOP OF THE GEARDRIVE ALTERNATE SHAFT CONSTRUCTION ATTACH THE SHAFT COLLAR ITEM 7 TO THE MIXER SHAFT ITEM 4 BEFORE STEP 1 QUANTITY VARIES DEPENDI...

Страница 6: ...operate this equipment unless all safety devices are installed and working properly Check all devices prior to starting the equipment Disconnect and lock out electrical power before installing or ser...

Страница 7: ...fferent phases The resistance should not be less than 100 megohms If the resistance is less please consult the factory If mixer is stored for more than a year the condition of the gear lubricant shoul...

Страница 8: ...lubricant level should be checked with the unit mounted in its correct operating position Lubricant should be added or removed to bring it to the correct level The catalog for the gear unit shows the...

Страница 9: ...accumulated moisture Drain regularly if storage atmosphere results in formation of condensation INSTALLATION Installation must be handled by qualified service or maintenance personal OPERATION CAUTIO...

Страница 10: ...necessary to ensure safe operation of the equipment Particular applications may require further procedures Dangerous voltages are present in the equipment which can cause severe personal injury and p...

Страница 11: ...e motor frame or housing permits removal of accumulated moisture Drain regularly MAINTENANCE LUBRICATION Gear units should have the oil changed every 10 000 hours or 2 years If synthetic lubricant is...

Страница 12: ...st a machined orifice until pressure exceeds 2 psi Above 2 psi the air is allowed to escape depressurizing the gearcase When internal pressure drops below 2 psi the autovent re seals closing the unit...

Страница 13: ...ak EP2 20 to 140 Mineral Shell Cypernia RA C3 Ambient Temperature F Formulation Grease Manufacturer Grease Brand Name 58 to 230 Synthetic Texaco Starfak 2202 58 to 230 Synthetic Shell Aero Shell 5 to...

Страница 14: ...ich were conducted without their prior written authorization BRAWN Mixer shall not be held liable for any further cost expense or labor to replace equipment or replaceable parts or indirect or consequ...

Страница 15: ...be performed only by qualified personnel Do not operate this equipment unless all safety devices are installed and working properly Check all devices prior to starting the equipment Disconnect and loc...

Страница 16: ...of lubricant that was applied during assembly it is important to completely fill the voids in the seven ring box with lubricant No further lubricant is required for the two ring box 1 Remove the lubr...

Страница 17: ...inspect the shaft for damage If the shaft is significantly worn it should be repaired or replaced 5 Select the correct size and type of packing refer to the mixer specification sheet Using a bar that...

Страница 18: ...engagement zone and record the measurement as B in the equation below 3 Add A B and subtract 0 08 2mm from the distance This needs to be done so that the coupling will not be preloaded after installa...

Страница 19: ...IEC 132 NEMA 180TC 210TC J28 28mm 1 1 8 in 45 90 Nm 399 797 lb in IEC 100 112 NEMA 180TC M42 42 mm 1 5 8 in 100 200 Nm 885 1 770 lb in IEC 160 NEMA 250TC M48 48 mm 1 7 8 in 140 280 Nm 1240 2 478 lb i...

Страница 20: ...Automatic Lubricator Principle of Operation After tightening the plastic activating screw the Zinc Molybdenum pellet drops into the Citric Acid electrolyte The chemical reaction builds up pressure tha...

Страница 21: ...apped hole on the end for customer use The chart below indicated the tap size for each shaft Keys are also supplied with solid shaft Outboard pinion and sprocket fits should be as recommended by the m...

Страница 22: ...ew into the motor shaft to lock coupling in place 3 Let the coupling cool down before mounting the spider into the jaws The spider should not be under axial compression when installed 4 Place the moto...

Страница 23: ...esume its normal function The lubricator contains approximately 120 cm3 or 120 ml 4 8 oz of grease For reference a single stroke of a typical grease gun delivers approximately 1 0 1 2 cm3 0 03 0 04 oz...

Страница 24: ...extreme highs and lows Lower ambient temperatures will lead to slower dis pensing rates and higher ambient temperatures will lead to faster dispensing rates Average Ambient Temperature Discharge Perio...

Страница 25: ...ice the grease cup 1 Unscrew the grease drain cup 1299 from either the outlet port of the NEMA or IEC input cylinder or from the extension 1243 that is secured to the NEMA or IEC input cylinder 2 To e...

Страница 26: ...TORQUE DRY AS SPECIFIED IN O M MANUAL BSB ALL DIMENSIONS AND WEIGHTS ARE FOR REFERENCE ONLY UNLESS THE DRAWING IS CERTIFIED ALL EQUIPMENT DESIGN AND APPLICATION DATA SHOWN HEREIN IS CONFIDENTIAL AND T...

Страница 27: ...THIS PAGE IS INTENTIONALLY LEFT BLANK...

Страница 28: ......

Отзывы: