82 Installation Checklist
PCB DIP switch setting (DIP SW 2, set of 8)
Yes
No
Gas type: Is switch #1 set correctly for LP (ON) or NG (OFF)?
If continuous boiler operation is required, is switch #7 in the up (ON) position?
If high temperature venting has been installed (CPVC or polypropylene), is switch #8 in the up (ON) position?
Operating the boiler
Yes
No
Have you given the Installation & Operation Manual and User’s Information Manual to the owner for future reference?
Have you shown the owner how to shut off the gas in case of an emergency?
Содержание NFB Series
Страница 112: ......
Страница 223: ...111 Annexes 12 6 Schéma des composants et nomenclatures 12 6 1 Boîtier 11 6 14 5 12 1 13 10 9 3 1 8 15 7 4 2 3 2 ...
Страница 229: ...Notes ...
Страница 230: ...Notes ...
Страница 231: ......