About the Boiler 19
2.7 Installation Procedure
The flow diagram below provides a step-by-step description of the recommended procedure for clear, easy installation of the NCB300
boiler in its final location. A detailed description is given of the procedure in the sequenced sections below:
Wall-mounting
»
Gas connection
»
Electrical connections
»
Flue gases exhaustion
system installation
»
Water and condensate
pipe connection
»
Gas changeover
(if necessary)
»
Final check
»
Boiler operation
»
p. 20
p. 23
p. 31
p. 43
p. 47
p. 48
p. 34
p. 68
Содержание NCB300-28K
Страница 81: ...Memo...
Страница 82: ...Memo...