Connecting Electrical Supplies 49
9.6.2 Connecting the Junction Box Connection (Y Plan)
The boiler is designed to be connected to a junction box (Y Plan). The Junction box cables are connected to the terminals 1-5 of the
CONM4 in the AC application part and the CONZ3 (POWER OUT) in the AC power line part.
Cylinder Stat
Gr
ey
Orange
3-Port Mid
Position
Zone Valve
1
2
C
White
Room Stat
2
1
3
1
2
3
4
5
6
7
8
9
10
Gr
een/Y
ello
w
Blue
1
2
3
4
1
2
3
$0/.
$0/; 108&3065
Boiler
Terminal
Block
CH_ON
DHW_ON
DHW_OFF
Switched
Live
L
N
PE
L
N
PE
AC Application and
AC Power Line Parts
Wiring
Centre
L
5
CH_ON
DHW_ON
DHW_OFF
Switched Live
L
Содержание LCB700-21RS
Страница 78: ...78 Appendices 13 2 2 Burner Cover Flame Tube...
Страница 80: ...80 Appendices Oil Pump Coupling Orifice Swirl Plate Oil Pump Motor Oil Pump Intake Pipe Flame Holder Assembly...
Страница 86: ...86 Appendices 13 2 5 DHW Parts 20 11 10 13 14 12 19 23 22 27 21 26 25 28 24 16 17 18 6 7 8 9 15 4 5 2 3 1...
Страница 92: ...Memo...
Страница 93: ...Memo...
Страница 94: ...Memo...
Страница 95: ......