1
M6
2
M5
3
M6
Start with a Side Frame (
A
) lay flat with slotted
rails upright. Place Mounting Rail (
C
) at
desired depth. Secure it in place with M6
screws (
H1
) and M6 cage nuts (
H4
).
Repeat on other side frame.
Attach the four Horizontal Structure Bars
(
D
) to the Side Frames (
A
) using M5 screws
(
H2
).
Lay top cover (
F-1
) on top of the cabinet
frame and secure with M6 screws (
H1
).
Repeat steps to secure Bottom (
F-2
) to
cabinet frame.
Mount optional L Bracket (
B
) or other
shevling accessoire as desired height, using
M6 screws (
H1
) and M6 cage nuts (
H4
).
Repeat on other side frame.
F-1
F-2
D
D
A
C
L
A
B
H
F-1
D
I
C
E
F-2
G
Legend:
A
B
C
D
E
F-1
F-2
G
H
I
Side Frame
L Bracket
Mounting Rail
Horizontal Structure Bar
Side Panel
Top Cover
Bottom
Tempered Glass Door
Back Panel
Hanger Bar
*
Although the depth of the optional bracket is not
permanent, it is recommended that you take this
time to ensure the space between mounting rails is
accurate to what your application requires.
*