Installation Manual Chapter4. System Installation
© 2016
Nautilus Hyosung Inc.
All Rights Reserved
.
4-1
Chapter4. System Installation
Unpacking
▶
Use the following instructions to unpack the MS500 with it on the palette.
1. Cut the straps that are fastened around the box with a knife.
(Be careful when cutting the straps. Refer to figure below.
2. Use an appropriate tool to remove the nails from the palette. (Refer to figure below)
3. Remove the lid, then box from the top. Do not discard the packaging materials until you have
verified any shipping damage claim. Contact your distributor immediately if you see any
shipping damage. Store the box in a safe place to re-use or discard of appropriately.
4. Verify the contents carefully with the packing list to be sure all items listed are included. Notify
your distributor of any shortages.
5.
If only the palette needs to be removed, lift the whole machine from the bottom and set it
aside.
▶
Removing the MS500 from the Palette
1. Remove bolts from equipment locking bracket.
2. Remove the Adjustor with a spanner.
3. Lift the MS500 using a lifting device.
4. Move the MS500 to the installation site.
PRECAUTION:
MS500 machine is very heavy equipment and can cause injuries if not handled with caution.
Read the following carefully.
▪ Firmly close the vault door and lock the door by turning the knob completely.
▪ Only experienced staff members should move the heavy machine.
▪ Do not tilt the ATM when moving.