
VS1 Installation Manual
Preparing for installation
Page 1-2
Issue 2.0 2010-12-01
Figure 1.1: Flowchart - Installing the transmitter
Mounting the transmitter - see page 2-1
Connecting to station reference ground - see page 3-1
Installing control and monitoring wiring - see page 7-1
Commissioning tasks - see page 8-1
Perform operational tasks:
“Commissioning”
and
“Going on-air”
, beginning on
page 8-2
Installing the RF feed line - see page 4-1
Installing program inputs - see page 6-1
Connecting ac power - see page 5-1
Содержание VS1
Страница 1: ...VS1 Transmitter Installation Manual Document VS1 INST Issue 2 0 2010 12 01 Status Preliminary...
Страница 2: ......
Страница 4: ......
Страница 8: ...VS1 Installation Manual Page viii Issue 2 0 2010 12 01...
Страница 26: ...VS1 Installation Manual Connecting ac power Page 5 2 Issue 2 0 2010 12 01...
Страница 38: ...VS1 Installation Manual Commissioning tasks Page 8 8 Issue 2 0 2010 12 01...
Страница 42: ...VS1 Installation Manual Parts and tools Page 9 4 Issue 2 0 2010 12 01...
Страница 53: ......