background image

 

https://www.naturewater.eu 

Item 50805 

Page 4 

 

 
 

   

09 2021

-1

 

 

Installation

 

 

 

 

1.  Install the three-way connector

 (1)

 and the ball valve

 (2)

 prior to the water tap. 

2.  In order to install the UF membrane

 (7),

 unscrew the lid cover of the UF filter housing

 (6),

 insert 

the UF membrane

 (7) 

and then screw the lid back on again. 

3.  Mount the swan neck water tap

 (10)

 in the required position and connect it to the outlet of the 

PI activated carbon filter “Gourmet”

 (9)

 with a PE connection tube. 

4.  The PE connection tubes are to be installed in the places A, B, and C. 
5.  Rinsing the system: After having installed the ball valve

 (2)

 and the swan neck water tap

 (10),

 

open the tap and let the water flow for 2 min. 

 
 

Operation

 

 

 

The system should be rinsed daily, by opening the purge valve

 (8)

 for 2 min. 

 

Before using the system for the first time, it should be prepared by opening the purge valve

 (8)

 

for  2 min  and  leaving  at  least  ½ 

ℓ  of  water  flow  through  the  swan  neck  water  tap

 (10).

  After 

having done so, the unit will provide clean water. 

 

After the last daily use of the filter unit, the ball valve

 (2)

 should be closed to protect the system 

against pressure shocks. 

 

 

Содержание NW-UF305

Страница 1: ...w the operating instructions and safety information before using for the first time Technical changes reserved Due to further developments illustrations functioning steps and technical data can differ insignificantly Updating the documentation If you have suggestions for improvement or have found any irregularities please contact us ...

Страница 2: ...t form https www wiltec de contacts The most recent version of this manual in various languages can be found in our online shop via https www wiltec de docsearch Our postal address is WilTec Wildanger Technik GmbH Königsbenden 12 52249 Eschweiler Germany Do you wish to pick goods up Our pick up address is WilTec Wildanger Technik GmbH Königsbenden 28 52249 Eschweiler Germany To shorten the waiting...

Страница 3: ...and make sure you have understood its content Keep these operation instructions safe Components installation Name Name 1 Three way connector 7 Ultra filtration membrane 2 Ball valve 8 Purge valve 3 Filter housing PP fine filter 9 PI activated carbon filter Gourmet 4 Filter housing granulated activated carbon 10 Swan neck water tap 5 Filter housing activated carbon block filter A C PE connection tu...

Страница 4: ... tube 4 The PE connection tubes are to be installed in the places A B and C 5 Rinsing the system After having installed the ball valve 2 and the swan neck water tap 10 open the tap and let the water flow for 2 min Operation The system should be rinsed daily by opening the purge valve 8 for 2 min Before using the system for the first time it should be prepared by opening the purge valve 8 for 2 min...

Страница 5: ... 6 12 months 3rd Activated carbon block filter Absorbs odorous and taste intensive sub stances chlorine and chlorinated com pounds 6 12 months 4th UF membrane Filtrates solved materials bacteria and vi ruses 1 2 years 5th Inline activated car bon Absorbs unpleasant odours 6 12 months Attention When installing the unit disconnect it from the water supply If the osmosis unit is not used disconnect i...

Отзывы: