background image

SOARING AMADINDA - POST MOUNT

INTENDED USE: AMADINDA IS TO BE USED WITH  FEET PLANTED FIRMLY ON THE GROUND.

9.

DIG POST HOLES 200mm [8"] LARGER THAN

THE DIAMETER OF EACH POST.

10.

DIG POST HOLES 1220mm [48"] DEEP.

11.

POST SHOULD HAVE A MINIMUM OF 100mm [4"]
OF CONCRETE ON ALL SIDES.

12.

SET POST 'A' AND 'D' SO THE EYE BOLT IS
APPROXIMATELY 508mm [20"] ABOVE
FINISHED GRADE.

13.

SET POST 'B' AND 'C' SO THE EYE BOLT IS
APPROXIMATELY 787mm [31"] ABOVE FINISHED
GRADE.

14.

FOLLOW INSTRUCTIONS ON THE BACK OF THE
CONCRETE BAG.

745mm [29 14"]

POST 'A'

POST 'B'

500mm [193

4"]

POST 'D'

POST 'C'

787mm

 [31"]

508mm

 [20"]

508mm

 [20"]

787mm

 [31"]

- POST C AND D SECTION -

- POST A AND B SECTION-

STEP 3: POST INSTALLATION

TOP OF
CONCRETE
FOOTING: -0.152m
[-6"]

LOCATION OF

LIFTING BOLTS

BOTTOM OF
CONCRETE
FOOTING: -1.220m
[-48"]

FINISHED GRADE:
+0.000m [+0"]

N.T.S.

N

s

INSTRUMENTS

FOR YOUR PLAYGROUND

DETAIL

PRODUCT NUMBER

PAGE

SCALE @ 8.5x11

DRAWN

CHECKED

PHONE NUMBER:

1-877-733-7459

NI-PG-

SOARING AMADINDA: POST MOUNT

403-06

SE

SE

3 OF 4

Содержание NI-PG-403-06

Страница 1: ...MEASURE UP PERPENDICULAR TO LAYOUT LINE 1 ONE 114mm 41 2 THIS IS THE CENTRE POINT OF POST D 7 AGAIN AT THE END OF LAYOUT LINE 1 ONE MEASURE UP PERPENDICULAR TO LAYOUT LINE 1 ONE 643mm 241 2 THIS IS THE ENTER POINT OF POST C 3127mm 123 POST A POST B POST C POST D LAYOUT LINE 1 ONE 745mm 29 1 4 3127mm 123 507mm 20 620mm 24 1 2 113mm 4 1 2 STEP 1 SPACE REQUIREMENT POST LAYOUT COMPONENTS LAYOUT PLAN N...

Страница 2: ... D NOTE THE EYEBOLT ON POST B SHOULD BE FACING THE EYEBOLT ON POST C THE EYEBOLT ON POST A SHOULD BE FACING THE EYEBOLT ON POST D 3193mm 125 3 4 3193mm 125 3 4 POST A POST B POST C POST D LAYOUT PLAN STEP 2 POST LAYOUT VERIFICATION N T S N s INSTRUMENTS FOR YOUR PLAYGROUND DETAIL PRODUCT NUMBER PAGE SCALE 8 5x11 DRAWN CHECKED PHONE NUMBER 1 877 733 7459 NI PG SOARING AMADINDA POST MOUNT 403 06 SE ...

Страница 3: ...O THE EYE BOLT IS APPROXIMATELY 787mm 31 ABOVE FINISHED GRADE 14 FOLLOW INSTRUCTIONS ON THE BACK OF THE CONCRETE BAG 745mm 29 1 4 POST A POST B 500mm 19 3 4 POST D POST C 787mm 31 508mm 20 508mm 20 787mm 31 POST C AND D SECTION POST A AND B SECTION STEP 3 POST INSTALLATION TOP OF CONCRETE FOOTING 0 152m 6 LOCATION OF LIFTING BOLTS BOTTOM OF CONCRETE FOOTING 1 220m 48 FINISHED GRADE 0 000m 0 N T S ...

Страница 4: ...IS MADE BY THE TURNBUCKLE TO THE POST 21 DISCONNECT THE SOARING AMADINDA ENDS ONE AT A TIME TO SLIDE THE HEAT SHRINK TUBING OVER THE HARDWARE NOTE DO NOT CUT THE HEAT SHRINK TUBING LENGTH WISE 22 ROLL HEAT SHRINK BACK BY 1 2 ON THE POST END OF THE TURNBUCKLE TO EXPOSE THE BOLT 23 HANG THE LOSE TURNBUCKLE BACK ON THE EYE BOLT AND ROLL THE HEAT SHRINK OVER THE EYE BOLT 24 SLIDE THE HEAT SHRINK UP OR...

Страница 5: ...1224mm 48 1223mm 48 1225mm 48 1227mm 48 N T S N s INSTRUMENTS FOR YOUR PLAYGROUND DETAIL PRODUCT NUMBER PAGE SCALE 8 5x11 DRAWN CHECKED PHONE NUMBER 1 877 733 7459 NI PG SOARING AMADINDA POST MOUNT LAYOUT 403 06 SE SE 1 OF 1 ...

Отзывы: