©Ecoflo Wastewater Management Pty Ltd
IMNL-008.151121
Page 7
STEP 3: INSTALL THE WASTE CHUTE
First ensure the pad or ground level on which the ‘In-service’ chamber will reside is at its final level beneath
the toilet room.
Insert the chute into the hole
Mark position
1
5
3
6
4
2