©Ecoflo Wastewater Management Pty Ltd
IMNL-008.151121
Page 3
Please check the
packing slip
to ensure everything has been delivered. If anything is missing, please
notify your supplier within 72 hrs of receipt.
Items you will need to complete your installation:
• Wall brackets to fix the vent pipe to the building
• A length of 100mm DWV vent pipe to connect to the air exhaust (length depends on specific
installation)
• Dektite if DWV vent pipe will penetrate the roof
You will also require the following materials for the Excess Fluid Absorption Trench (check with your
local Authority):
• 2.0m length of 100mm diameter agricultural pipe
• 2.0m x 0.5m synthetic or Hessian geotextile mat
• 0.30 cubic metre 20 mm Aggregate
• 50mm PVC pipe to connect the hose to the agricultural pipe
OR
Purchase a Drain Kit from Ecoflo.
WHAT’S IN THE BOX?
TOOLS REQUIRED
PVC
CEMENT
SILICONE
Marker
Tape Measure
Shovel
Hand Saw
Jigsaw
Plumb Bob
PVC Cement
Caulk Gun
Power Drill
Philips Drill Bit
Masonry and Brad Point
Drill Bits
Hole Saw Drill Bit