Installing the Application Software and Driver...................................................................... 12
Installing the NI FlexRIO Devices..........................................................................................13
Unpacking....................................................................................................................... 13
Preparing the Environment............................................................................................. 14
Installing the NI FlexRIO FPGA Module.......................................................................14
Confirming that Measurement & Automation Explorer (MAX) Recognizes the
Installing PXI EMC Filler Panels........................................................................................... 16
Uninstalling the Hardware...................................................................................................... 17
Environment............................................................................................................................18
Shock and Vibration................................................................................................................18
Compliance and Certifications................................................................................................19
Safety.............................................................................................................................. 19
Electromagnetic Compatibility....................................................................................... 19
CE Compliance .............................................................................................................. 19
Online Product Certification........................................................................................... 19
Environmental Management........................................................................................... 20
Where to Go Next................................................................................................................... 20
Worldwide Support and Services............................................................................................ 21
Electromagnetic Compatibility Guidelines
This product was tested and complies with the regulatory requirements and limits for
electromagnetic compatibility (EMC) stated in the product specifications. These requirements
and limits are designed to provide reasonable protection against harmful interference when the
product is operated in the intended operational electromagnetic environment.
This product is intended for use in industrial locations. However, harmful interference may
occur in some installations, when the product is connected to a peripheral device or test object,
or if the product is used in residential or commercial areas. To minimize interference with
radio and television reception and prevent unacceptable performance degradation, install and
use this product in strict accordance with the instructions in the product documentation.
Furthermore, any modifications to the product not expressly approved by National Instruments
could void your authority to operate it under your local regulatory rules.
Caution
To ensure the specified EMC performance, operate this product only with
shielded cables and accessories.
Caution
To ensure the specified EMC performance, the length of all I/O cables
must be no longer than 3 m (10 ft).
2
|
ni.com
|
NI 6581/6581B Getting Started Guide