Power Up the FieldPoint System
Make sure the RESET DIP switch is not on.
Plug in each power supply to the FieldPoint
bank. You should see the
POWER
and
STATUS
LEDs come on. After about 5 seconds, the
STATUS
LED begins flashing, one flash at a
time. This indicates that the FP-20
xx is ready to
be configured. (If the
STATUS
LED turns off,
and the
A
,
B
,
C
,
and
D
LEDs come on, the
FP-20
xx has been configured and LabVIEW RT
is starting up.) If the LEDs do not follow this
sequence, refer to the
FP-20xx User Manual
troubleshooting appendix.
7
8
FP-20xx Quick Start Guide
ni.com
CAUTION
Terminal bases must be connected to the FP-20
xx before power is
applied to the FP-20
xx.
Connect to Field Devices
Use the operating instructions for each I/O module to help you connect field devices.
6
1
2
3
4
5
DISABLE VI
SAFE MODE
RESET
O
F
F
/
O
N
322759d.qxd 4/4/2003 4:58 PM Page 8