cFP-20xx Quick Start Guide
16
ni.com
7. Powering Up the cFP-20
xx
Check the DIP switches on the controller, making sure that the RESET IP switch
is not enabled. Plug in each power supply to the Compact FieldPoint system. The
cFP-20
xx
runs a power-on self test (POST) that takes several seconds. You should
see the POWER and STATUS LEDs come on. After about five seconds, the
STATUS LED begins flashing steadily. The cFP-20
xx
is ready to be configured.
If you have already assigned an IP address to the cFP-20
xx
, the STATUS LED
turns off, and the A, B, C, and D LEDs come on for about 15 seconds as LabVIEW
RT starts up. Once they turn off, the I/O module READY LEDs come on, and the
cFP-20
xx
is ready for use. The total boot time for a configured system is 30–45
seconds.
If the STATUS LED does not light up as described here, refer to the
cFP-20xx and
cFP-BP-x User Manual
.
DIP Switches
Functions
1, 2 .........................User-configurable on
cFP-2000 and cFP-2010;
disabled on cFP-2020
3, 4, 5 .....................User-configurable
6 .............................DISABLE VI
7 .............................SAFE MODE
8 .............................RESET IP
12
3
4
5
68
7
ON