background image

National Cycle, Inc.

PO Box 158 Maywood, IL     60153-0158 USA

708-343-0400 / Fax: 708-343-0625     www.nationalcycle.com     e-mail: [email protected]

©2019 National Cycle, Inc.

Page 2 of 3

10-110802-000    06/19

Fig. 04

Fig. 05

Fig. 06

Fig. 07

Fig. 08

INSTALLATION; CONT’D

6.

Place the new windscreen into position and reinstall the two

6x12 10mm Bolts and 9.5x18 Washers securing the windscreen

at the top left/right.

Fig. 04

7.

Reinstall the two 5x14 Panhead Allen Screws and 5mm

Thrust Washers securing windscreen at the bottom left/right,

making sure the threads capture the internal Wellnuts.

Fig. 05

8.

Replace the windscreen cowl by aligning the top tabs with the

top slots and the hidden tabs with their hidden slots.

Fig. 06

While reinstalling the cowl, push down on the metal tab at the

bottom front and make sure the plastic cowl goes above it.

Fig. 07

Installing the cowl correctly requires patience and may take

more than one attempt. Be careful not to break the plastic tabs.

9.

When the cowl is completely installed, make sure the 20x25

Dual Lock™ Fasteners under the front end are rejoined and

then reinsert the two 4x16 Self-Tapping Phillips Screws under

the nose of the new windscreen.

Fig. 08

You’re all done.

Enjoy the ride with your new Windscreen!

Отзывы: