Installation
6-
1
6 - Installation
6.1 Introduction
6.2 Initial inspection
This section provides the information needed to install the PMM LISN
Network.
Included is information pertinent to initial inspection, power requirements,
interconnections, environment, instrument mounting, cleaning, storage and
shipment.
To avoid hazardous electrical shock, do not turn on the instrument
when there are signs of shipping damage to any portion of it.
6.3 Packing Unpacking
Inspect the shipping container for damage.
If the shipping container or cushion material is damaged, it should be kept
until the contents of the shipment have been checked for completeness
and the instrument has been checked mechanically and electrically.
Verify the accessories availability in the shipping container referring to the
accessories check list enclosed with the Operating Manual.
Notify any damage to the carrier as well as the NARDA Representative.
To remove the LISN, open the wooden box and unscrew the four screws
that hold the LISN at the bottom side of the palette.
Unit weight exceed 70 kg. To avoid hazard of personal injury use a
suitable lifting device for PMM L3-100 Network handling.
Unit weight exceed 200 kg. To avoid hazard of personal injury use a
suitable lifting device for PMM L3-500 Network handling.
Unit weight exceed 50 kg. To avoid hazard of personal injury use a
suitable lifting device for PMM L3-64 Network handling.
Document L3EN-70206 - © NARDA 2007
Содержание PMM L3-100
Страница 10: ...X EC Conformity This page has been left blank intentionally...
Страница 14: ...1 4 General Information This page has been left blank intentionally...
Страница 20: ...2 6 PMM L3 32 This page has been left blank intentionally...
Страница 32: ...5 4 PMM L3 500 This page has been left blank intentionally...
Страница 36: ...6 4 Installation This page has been left blank intentionally...
Страница 42: ...Suggerimenti Commenti Note Suggestions Comments Note...