Part 4
Part 4
–
–
Operation
Operation &
& Maintenance
Maintenance
15
15
LiFePO
LiFePO
4
4
Battery
Battery Module
Module for
for Telecom
Telecom
Operation
Operation Manual
Manual
4.4
4.4
–
–
Installation
Installation
4.4.1
4.4.1
–
–
Unboxing & Inspection
Unboxing & Inspection
Please study this manual
Please study this manual before installation.
before installation.
Please inspect the package before unboxing, if any destroy with appearance, contact
Please inspect the package before unboxing, if any destroy with appearance, contact
with the supplier as soon
with the supplier as soon as possible.
as possible.
This device shall be installed and operated by professionals.
This device shall be installed and operated by professionals.
4.4.2
4.4.2
–
–
Preparation for Installation
Preparation for Installation
Batteries shall not be placed in direct sunshine or
Batteries shall not be placed in direct sunshine or close to heat source.
close to heat source.
Batteries shall be installed in place with good ventilation to assure enough heat
Batteries shall be installed in place with good ventilation to assure enough heat
dissipation.
dissipation.
Batteries shall be placed in are with clean ambient and
Batteries shall be placed in are with clean ambient and low humidity
low humidity..
Heavy weight shall not be placed on any cable.
Heavy weight shall not be placed on any cable.
4.4.3
4.4.3
–
–
Installation of Battery Modules
Installation of Battery Modules
1) Installation and fixation
1) Installation and fixation
Battery modules of NPFC series are applicable to installation in 19inches cabinets and
Battery modules of NPFC series are applicable to installation in 19inches cabinets and
wall-hanging.
wall-hanging.
19inch cabinet installation
19inch cabinet installation
Insert battery module into 19 inch cabinet, and fix two handles of battery
Insert battery module into 19 inch cabinet, and fix two handles of battery
module with cabinet rack using 4pcs M5 screws.
module with cabinet rack using 4pcs M5 screws.
W
Wall-hanging
all-hanging installation
installation
Wall-
Wall-
hanging installation also can be adopted, fix two handles of batter
hanging installation also can be adopted, fix two handles of batter
module with triangle rack on the wall using 4pcs M5 screws.
module with triangle rack on the wall using 4pcs M5 screws.
2) Ground connection
2) Ground connection
GND screw in front panel of battery is connected with ground through a
GND screw in front panel of battery is connected with ground through a
flexible cable
flexible cable above 16A
above 16AWG.
WG.
3) Battery output connection
3) Battery output connection
Connect ‘+’ of
Connect ‘+’ of
Battery
Battery Output
Output
with positive female copper bar of power plant, and ‘
with positive female copper bar of power plant, and ‘
--
’’
with negative breaker or fuse.
with negative breaker or fuse.
If multi battery modules will be connected in parallel, connect ‘+’ of
If multi battery modules will be connected in parallel, connect ‘+’ of
Battery Output
Battery Output
of
of
each battery module
each battery module
with positive female copper bar of power plant, and ‘
with positive female copper bar of power plant, and ‘
--
’ with
’ with
negative breaker or fuse.
negative breaker or fuse.
Содержание NPFC Series
Страница 2: ......
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 14: ......
Страница 16: ......
Страница 18: ......
Страница 20: ......
Страница 22: ......
Страница 24: ......
Страница 26: ......
Страница 28: ......
Страница 30: ......
Страница 32: ......
Страница 34: ......
Страница 36: ......
Страница 38: ......
Страница 40: ......
Страница 42: ......
Страница 44: ......