background image

 

 

 

 

CONTENTS 

 

Important Safety Recommendations..

…………………………….………………………….….1-2 

 

Basic function introduction

………..……………………………………………….……………...2 

 

Special function introduction

…………

.

…………………………………………………………..2 

 

Installation (aluminum track)

………………………………………….…………………………..3-4 

 

Installation (steel track)

………………………………………….…………………………….…..5-6 

 

Installation recommendations

……………………………………………………………………..7 

 

Basic function setting and applying……………………………………………………………..8-9 

 

Special function introduction and application

………………………………………….……….10 

 

Aluminum & steel track accessories list

………………………………………………….……...11 

 

Manual disengagement

……………………………………………………………………………12 

 

Maintenance

………………………………………………………………………………………...13

 

 

Final note

….………………………………………………………………………………………...13 

 

Important information for the user

………………………………………………………………...13

 

 

 

 

 

 

 

Содержание SDO800

Страница 1: ...manual carefully before installation and use The installation of your new door opener must be carried out by a technically qualified or licensed person Attempting to install or repair the door opener...

Страница 2: ...stallation aluminum track 3 4 Installation steel track 5 6 Installation recommendations 7 Basic function setting and applying 8 9 Special function introduction and application 10 Aluminum steel track...

Страница 3: ...en stationary before driving in or out of the garage 7 Make sure the garage door is fully closed stationary before leaving 8 Keep hands and loose clothing off the opener and garage door all the time 9...

Страница 4: ...ion 1 Soft start soft stop Minimize start up load on garage door opener and garage door 2 Opening closing force self learning 3 Overloading force detecting the door will reverse more than 15 cm automa...

Страница 5: ...IN SHUTTLE ASSEMBLY As for the ease of the chain it is delivered with the chain and chain shuttle already assembled in the track If you need to assemble it yourself connect the chain shuttle to the ch...

Страница 6: ...to the ceiling with the correct fixing Fig 5 maintaining a minimum gap of 30mm from the top panel s maximum height Fig 6 Check measurements for drilling insert and lock the brackets F and fix the Smar...

Страница 7: ...5 Installation steel track Fig 1 Fig 2...

Страница 8: ...ce Notice Make sure the track is horizontal and vertical to the shaft Make sure the connection of iron angle B and ceiling is firm enough 5 Fixing the track by iron angle A and U bracket B 6 The conne...

Страница 9: ...may be subject to damage if the control unit is abused 5 Make sure that you have all the necessary materials and they are suitable for this kind of use 6 Read all the instructions thoroughly and make...

Страница 10: ...ust the down limit by pressing LIM 2 button Fine tuning LIM 1 up or LIM 2 down button to determine the final down limit position then press set button The opener will operate a cycle automatically to...

Страница 11: ...Press LIM 2 button the auto close time decrease 1 minute The auto close function will be turned off when LED displays 0 Press SET button to confirm Press LIM 2 button and hold on until the LED displa...

Страница 12: ...in accordance with the special needs of customers 1 The O S C button function Add an O S C button to open or close the door 2 Auto safety reverse function This special function is for safety consider...

Страница 13: ...6 14 bolt 8 8 16 hexagon head bolt 2 8 25 axis pin 1 6 flange 10 8 flange 4 28 18 fixing kit 1 10 15 fixing kit 1 Steel track accessories list Name amount Bracket for door panel 1 Bracket for track 1...

Страница 14: ...in state it is recommended that an external disengagement device should be fitted Fig 13 Maintenance 1 No particular maintenance is required for the logic circuit board Check the door at least twice a...

Страница 15: ...of the opener including the using of manual disengagement cord Inform the owner about the need of a regular and accurate maintenance especially regarding a regular check of the safety and reversing de...

Страница 16: ...73 75 Magnesium Drive Crestmead Qld 4132 Ph 07 3803 7600 Fax 07 3803 7611 Email enquiries napoleongd com au Web www napoleongd com au...

Отзывы: