background image

INSTALLATION INSTRUCTIONS: 

 

The backdraft damper must:

  Be mounted vertically, tab end 

down, immediately off the appliance or immediately after the elbow when 
venting off the side.  (Not required when taking off the bottom of the unit)  
Some prefabricated chimney systems may require side venting.
1.  Turn off any electrical power to the appliance.
2.  Remove the top louvers.  Decide on a top or side installation and remove 
the corresponding duct cover plate from the appliance.
3 a.  TOP INSTALLATION:  Cut the insulation, remove the inside top knock 
out, remove the heat shield knock out.  Insert the backdraft damper, as 

shown, until rib touches 
the top of the fi replace.  
Bend out the tabs to 
secure the damper.  
3 b.  SIDE 
INSTALLATION:  On an 
8” diameter, 90º stove pipe elbow, cut and bend out 4 tabs.  Secure, facing up, 
to the appliance side re-using the screws that had held the duct cover in place.  
Attach the backdraft damper.
4.  Check that the backdraft plates will freely fall back into the closed position 
before adding duct work.  
5.  Duct work may now be added to the damper and secured with 3 screws.
6.  Locate the blower in a convenient location.  The blower may be installed 
vertically or horizontally using brackets provided; a horizontal installation 
located away from the ceiling may use plumber’s strapping.  Connect the 
blower inlet side to the duct work coming from the backdraft damper.
7.  Duct work may now be run to individual rooms.  A maximum of six 5” 
diameter or fi ve 6” diameter runs may be installed.
8.  Wire in the blower as shown in the schematic.
9.  Complete the appliance and ducting enclosure according to the appliance 
installation instructions.

The factory installed variable speed switch is to be used for the blower.  If fan kit NZ62 is used, a second variable speed 
switch will be required.  The wall mounting bracket is supplied for wall mounting, if desired.

NOTE:  REMOTE VENTING OPTIONS MAY COME 
OFF THE SIDE OR THE TOP IN ZERO CLEARANCE 
INSTALLATIONS BUT MUST EXIT FROM THE 
SIDE(S) ON MASONRY SYSTEMS.

NOTE: MASONRY REMOTE VENTING OPTIONS COME OFF THE 
SIDE INSTEAD OF THE TOP.

*

BLOWER TROUBLE SHOOTING:

If the blower fails to operate, check the following:
a.  fuse or circuit breaker
b.  is all wiring done as per schematic
c.  ensure proper wire contact
d.  use a meter to test for continuity between fan leads.
If blower problems continue, contact your authorised Wolf Steel Ltd. dealer/distributor.

MAINTENANCE:

At least once a season, clean the impeller area to get rid of any accumulated objects such as lint or dust.  Since the blower motor 
housing is sealed, no lubrication or further maintenance is required.

APPLIANCE PERFORMANCE FACTORS:

Wolf Steel Ltd. will not guarantee that this appliance and its options will completely heat your entire house due to the variances of 
climate, location, type of wood and dryness, temperature, home insulation, building structure, etc.

NZ-26/CZ-26/NZ-26WI Only

Отзывы: