EN
W415-2978 / 02.16.21
7
general information
1.2
rates and effi ciencies
Natural Gas
Propane
Altitude (FT)
0-4,500
Max. Input (BTU/HR)
40,000
Min. Inlet Gas Supply Pressure
4.5" (11mb) w.c.
11" (27mb) w.c.
Max. Inlet Gas Supply Pressure
13" (32mb) w.c.
Manifold Pressure (Under Flow Conditions)
3.5" (9mb) w.c.
10" (25mb) w.c.
1.3 installation
overview
For your satisfaction, this appliance has been test-fi red to assure its operation and quality.
1. Determine the fi nal location of the appliance (see “location” section).
2. Determine the most appropriate gas inlet location (see “gas inlet location” section).
3. Plan out appliance enclosure, framing, fronts, accessories, etc.
4. Install rough framing (see “framing” section).
5. Install all electrical wirings (refer to “electrical information” section).
6. Install gas lines (see “gas installation” section).
7. Test
appliance.
8. Install nailing tabs (see “nailing tab installation” section).
9. Complete framing (see “framing” section).
10. Complete fi nishing (see “fi nishing” section).
10
4
6
7
3
2
1
5
8
9