Napoleon GD40-N Скачать руководство пользователя страница 19

19

WS-415-091 / 06.26.00

VERTICAL VENTING INSTALLATION

1. 

Move the fireplace into position.

2. 

Fasten the roof support to the roof using the screws

provided. 

FIGURE 31.

 The roof support is optional. In this

case the venting is to be adequately supported using ei-
ther an alternate method suitable to the authority having
jurisdiction or the optional roof support.

3.

 Apply high temperature sealant to the outer edge of the

inner sleeve of the air terminal. Slip a 4" diameter coupler a
minimum of 2" over the sleeve and secure using 3 screws.

4

.

 Apply high temperature seal-

ant to the outer edge of the of the
outside sleeve of the air terminal.
Slip a 7" diameter coupler over the
sleeve and secure as before. Trim
the 7" coupler even with the 4" cou-
pler end. 

FIGURE 35.

5

.

 Thread the air terminal pipe

assembly down through the roof
support and attach, ensuring that
a minimum 16" of air terminal will
penetrate the roof when fas-
tened. 

FIGURE 33.

If the attic space is tight, we recommend threading the Wolf
Steel vent pipe collar or equivalent loosely onto the air termi-
nal assembly as it is passed through the attic. FIGURE 28.

The air terminal must be located vertically and plumb.

6

.

 Remove nails from the shingles, above and to the

sides of the chimney. Place the flashing over the air termi-
nal and slide it underneath the sides and upper edge of
the shingles. Ensure that the air terminal is properly cen-
tred within the flashing, giving a 3/4" margin all around.
Fasten to the roof. Do NOT nail through the lower portion of
the flashing. Make weather-tight by sealing with caulking.
Where possible, cover the sides and top edges of the flash-
ing with roofing material.

7.

 

Apply a heavy bead of waterproof caulking 2 inches

above the flashing. Slide the storm collar around the air
terminal and down to the caulking. Tighten to ensure that a
weather-tight seal between the air terminal and the collar
is achieved. Attach the other storm collar centred between
the air intake and air exhaust slots onto the air terminal.
Tighten securely. Attach the rain cap.

8.

  Continue adding rigid venting sections, sealing and

securing as above. Attach a 4" collapsed telescopic pipe
to the last section of rigid piping. Secure with screws and
seal. Repeat using a 7" telescopic pipe.

9. 

Run a bead of high temperature sealant around the

outside of the 4" elbow. Pull the adjustable pipe a mini-
mum 2" onto the elbow. Secure with 3 screws. Repeat with
the 7" telescopic pipe.

10. 

In the attic, slide the vent pipe collar down to cover up

the open end of the shield and tighten. This will prevent
any materials, such as insulation, from filling up the 1" air
space around the pipe.

For safe and proper operation of the fireplace, follow
the venting instructions exactly.
Horizontal runs may have a zero inch rise per foot using
Simpson Dura-Vent or Napoleon rigid venting compo-
nents.

The vent system must be supported approximately every 3
feet for both vertical and horizontal runs.  Use Napoleon
vent spacers 

WS-615-33

 or equivalent every 3 feet and

either side of each elbow to maintain the minimum 1¼"
clearance between the outer and inner vent pipes. Use
noncombustible strapping to maintain the minimum 2"
clearance to combustibles for both vertical and horizontal
runs.

FIREPLACE VENT CONNECTION

1. 

Apply high temperature sealant to the outer edge of

the 4" inner collar of the fireplace.  Attach the first vent
component and secure using 3 self tapping screws. Re-
peat using 7" piping.

2. 

Slide the insulation sleeve over the 7" pipe. 

The insu-

lation sleeve is only required for the first 2 feet off the fire-
place or from the fireplace to the first firestop spacer (which-
ever distance is less) and needs only a 1" clearance. 

Fig-

ure 34.

Ensure that the insulation sleeve is pulled tight to the
fireplace after all vent components are installed.

HORIZONTAL AIR TERMINAL INSTALLATION

1. 

Move the fireplace into position. Measure the vent length

required between terminal and fireplace taking into ac-
count the additional length needed for the finished wall
surface and any 1¼" overlaps between venting compo-
nents.

2. 

Holding the air terminal (lettering in an upright, read-

able position), insert into both vent pipes with a twisting
motion to ensure that both the terminal sleeves engage
into the vent pipes and the sealant. Secure the terminal to
the exterior wall and make weather tight by sealing with
caulking (not supplied). 

 Figure 29.

The air terminal mounting plate may be recessed into
the exterior wall or siding by 1½", the depth of the return
flange.

FIGURE 35

INSTALLATION

USING RIGID VENT COMPONENTS

Содержание GD40-N

Страница 1: ...apoleon Rd Barrie ON Canada L4M 4Y8 705 721 1212 R 2000 WARNING If the information in these instructions is not followed exactly a fire or explosion may result causing property damage personal injury...

Страница 2: ...thing ignition Supervise young children when they are in the same room as the fireplace Due to high temperatures the fireplace should be located out of traffic and away from furniture and draperies Cl...

Страница 3: ...3 WS 415 091 06 26 00 RIGHT OPEN END MODEL LEFT OPEN END MODEL PENINSULA MODEL SEE THRU MODEL...

Страница 4: ...ial Labour costs to the however requires the prior approval of an authorized company official Labour costs to the account of account of account of account of account of NAPOLEON NAPOLEON NAPOLEON NAPO...

Страница 5: ...as well as having a 1 inch air gap After the insulation sleeve a 2 air gap must be maintained between the re maining vent system and combustibles FIGURE 39 GENERAL INFORMATION FOR YOUR SATISFACTION A...

Страница 6: ...r 2 feet must be wrapped in the 1 inch thick insu lation sleeve supplied as well as having a 1 inch air gap Use a firestop when penetrating interior walls floor or ceiling The fireplace must be instal...

Страница 7: ...a sidewalk or paved driveway which is located between two sin gle family dwellings and serves both dwellings Local codes or regulations may require different clearances All horizontal runs must have a...

Страница 8: ...foot and 18 feet FIGURES 7 VENTING OPTION 4 Use this chart to calculate the vertical rise when using a total of 2 horizontal runs that consist of 8 feet maximum or 2 feet maximum length when the vert...

Страница 9: ...installation may be vented hori zontally or vertically In the United States it may only be installed vertically See Vertical Venting or Horizontal Air Terminal Installation for installation The firep...

Страница 10: ...EET Clearance above grade veranda porch deck or balcony Clearance to windows or doors that open Clearance to permanently closed windows Vertical clearance to ventilated soffit located above the termin...

Страница 11: ...installation A horizontal vent installation requires a minimum height of 42 including the 2 clearance to combustibles FIGURE 12 A FIGURE11 TOP EXTENTION TOP OF THE UNIT FIGURE14 42 38 FIGURE12 COUNTE...

Страница 12: ...system Objects placed in front of the fireplace should be kept a minimum of 48 away from the front face FINISHING Refer to page 20 for complete instructions regarding man tle requirements and install...

Страница 13: ...k insulation sleeve supplied as well as having a 1 inch air gap FRAMING It is best to frame your fireplace after it is positioned and the vent system is installed Use 2x4 s and frame to local building...

Страница 14: ...stible material brick stone or ceramic tile may protrude in these areas It is not necessary to install a hearth extension with this fireplace system Objects placed in front of the fireplace should be...

Страница 15: ...ust be wrapped in the 1 inch thick insulation sleeve supplied as well as having a 1 inch air gap FRAMING It is best to frame your fireplace after it is positioned and the vent system is installed Use...

Страница 16: ...specific kit required 1 Determine the air terminal location cut and frame 11 inch openings in the ceiling and the roof to provide the minimum 2 inch clearance between the fireplace pipe liner and any...

Страница 17: ...de and or secure to the floor using screws inserted through the two diameter holes in the front left and right corners of the base The liners should be flush with the exterior wall The air terminal mo...

Страница 18: ...oof caulking 2 inches above the flashing Slide the storm collar around the air terminal and down to the caulking Tighten to ensure that a weather tight seal between the air terminal and the collar is...

Страница 19: ...d piping Secure with screws and seal Repeat using a 7 telescopic pipe 9 Run a bead of high temperature sealant around the outside of the 4 elbow Pull the adjustable pipe a mini mum 2 onto the elbow Se...

Страница 20: ...optional remote wall switch or millivolt thermostat may be installed in a convenient location Route 2 strand solid core millivolt wire through the electrical hole located at the bottom left side of th...

Страница 21: ...rs into pieces and place along the perimeter of the runner burners as well as covering all of the burner area beneath and in front of the hollowed out section of log 1 2 Care should be taken to shred...

Страница 22: ...xt Attach magnets to the top and bottom door trim approximately 4 from either end Lift up the top trim and hook over the top of the door The bottom trim is inserted into the bottom door sill Push in t...

Страница 23: ...ow the blower to be positioned away from the intended gas supply hole Secure the blower using the lock washers and wing nuts provided Remove the thermodisc from the Z shaped mount ing bracket and re a...

Страница 24: ...to clear out any gas If you smell gas including near the floor Stop Follow B in the above safety information on this label If you don t smell gas go the next step 5 Turn gas knob counter clockwise to...

Страница 25: ...ely allow 15 to 30 minutes for the final flame colour to be established FIGURE52 P I P I PILOT SCREW L O T N O L O T HI L O F F O FIGURE50 FLAME MUST ENVELOP UPPER 3 8 TO 1 2 OF THERMOCOUPLE THERMOPIL...

Страница 26: ...OR HEAT SHIELD GA GD 020 042 PKG OF 5 DOOR SCREWS GA GD 475 161 REAR BRICK PANEL GA GD 225 045 BLACK END DOOR FRAME GA GD 322K BLACK END DOOR c w GLASS WS 300 027 END DOOR GLASS ONLY GD 010 540 END DO...

Страница 27: ...N OFF SWITCH GA GD 100 048 LEFT RUNNER BURNER GA GD 100 049 RIGHT RUNNER BURNER WS 100 042 MAIN BURNER WS 680 04 THERMOPILE WS 680 05 THERMOCOUPLE WS 725 26 PROPANE GAS VALVE WS 725 25 NATURAL GAS VAL...

Страница 28: ...NDOW KIT SIDE DOOR ONLY WS 660 2 HAND HELD WIRELESS REMOTE SWITCH WS 660 010 REMOTE CONTROL ADVANTAGE WS 660 011 REMOTE CONTROL ADVANTAGE PLUS WS 175 1 4 COUPLER WS 175 13 7 COUPLER KB35 VARIABLE SPEE...

Страница 29: ...E READINGS BE SURE TO TURN SCREWS CLOCKWISE FIRMLY TO RESEAL DO NOT OVERTORQUE Leak test with a soap and water solution Unit is over fired or under fired P I A B P I L O T N O L O T HI L O F F O Main...

Страница 30: ...re is connected to the push button ignitor check if the push button ignitor needs tightening replace the wire if the wire insulation is broken or frayed replace the electrode if the ceramic insulator...

Страница 31: ...WS 415 091 06 26 00 Wolf Steel Fireplace Service History This fireplace must be serviced at least annually depending on usage Date Service Technician Name Service Performed Special Concerns Dealer Na...

Страница 32: ...32 WS 415 091 06 26 00 NOTES...