13
WS-415-091 / 06.26.00
BRICK PANEL INSTALLATION
Start by inserting the top of the rear panel into the brick
holder as illustrated. Push the bottom of the panel tight
against the door cover. Insert the side panel and install the
retaining bracket at the end to secure the panel. (Only one
bracket is required.) Install the remaining panels as illus-
trated. When installing the bricks in step 3, slide the left
floor panel underneath the rear brick panel.
VENTING
Refer to page 16-19 for venting specifics. The first 2 feet of
outer 7 inch diameter vent pipe from the appliance or from
the unit to the first firestop spacer (whichever distance is
less) must be wrapped in the 1 inch thick insulation sleeve
(supplied) as well as having a 1 inch air gap.
FRAMING
It is best to frame your fireplace after it is positioned and
the vent system is installed. Use 2x4's and frame to local
building codes.
FIGURE 18.
See PAGE 11 for bar type / countertop installation.
If a blower is to be
used, for ease of in-
stalling or servicing
the blower, route
the gas line through
the rear gas access
hole.
FIGURE 18
NOTE: LEFT CORNER UNIT ILLUSTRATED
To install the fireplace face flush with the finished wall,
position the framework to accommodate the thickness
of the finished wall. The fireplace must be installed
against finished walls. Do not install against a vapour
barrier or exposed insulation.
N
O
T
O
L
O
I
FF
P
H
I
LO
FIGURE 17
A
A
= 21-3/4" minus finishing material thickness each side.
FIGURES 19
BRICK HOLDER
STEP 3
STEP 4
STEP 2
RETAINING BRACKET
STEP 1