20
W415-0811 / A / 04.28.10
4.4 BRICK PANEL INSTALLATION
RETAINER
DETAIL 5
STEP 3
STEP 2
STEP 1
STEP 4
STEP 5
Install the base panels as illustrated. The side panel sits under the bracket tab. Holding the side panel in
position, bend down the tab to secure.
4.5 FACING
4.6 FINISHING
Combustible materials may be installed
fl
ush with the
front of the appliance but must not cover any of the black
face-areas of the appliance. Non-combustible material
(brick, stone or ceramic tile) may protrude in these areas.
It is not necessary to install a hearth extension with this
appliance.
When roughing in the appliance, raise the appliance
to accommodate for the thickness of the
fi
nished
fl
oor
materials, (tile, carpeting, hard wood) which if not planned
for will interfere with the opening of the lower access
door and the installation of many decorative
fl
ashing
accessories.
Objects placed in front of the appliance should be kept a
minimum of 48" away from the glass front face.
DRYWALL
DRYWALL
5" MIN
Refer to "FINISHING" section for complete instructions regarding mantel requirements and installations, log
placement, glass door and upper and lower louvre attachments.