Page 12
INLET MANIFOLD SERVICE
7.SERVICE ‘A’ INSTRUCTIONS
(Every 12,000 hrs or 24 months)
NDK-010, 020, 030, 040, 050
MODELS:
NDL-010, 020, 030, 040, 050
Figure 5.
Figure 6.
29. Insert the new gasket seal into
the gasket groove on the underside
of the outlet (top) manifold ensuring
it is fully retained.
30. Remove and discard the nitrile
ball from the outlet manifold.
31. Replace the nitrile ball from
the service kit, into the 3 way valve
orifice.
32. Sit the purge block back on top
of the outlet manifold and replace
the 4x M4 cap head screws at torque
setting of 3Nm. Refer to page 18 for
the correct tightening sequence.
33. Replace the outlet (top) manifold
assembly back on top of the dryer
column and secure with the 2x M6
long and 8x M6 short cap head
screws tightening to a torque
setting of 5Nm. Refer to the page
18 and follow the correct tightening
sequence.
34. The seal between the dryer
column and outlet (top) manifold
should be checked for leaks prior to
fitting the top cover and operating
the dryer.
35. Replace the dryer top cover and
secure with the 4x M5 screws. These
screws should be hand tightened or
tightened at a torque setting of less
than 1Nm.
NOTE
: Ensure you refer to the page
18 and follow the correct tightening
sequences.
Содержание D1 Series
Страница 1: ...MAINTENANCE SERVICE MANUAL D1 SERIES HEATLESS COMPRESSED AIR DRYER www n psi co uk...
Страница 20: ...Page 20 14 PROCESS INSTRUMENTATION DIAGRAM 14 1 NDL 010 050 Water Separator...
Страница 24: ...Page 24 NOTES...
Страница 25: ......