Installation Instructions 

The installation of the CSW75 system requires a working

 

knowledge and experience in the use of tools, equipment,

 

and methods necessary for the installation of aluminum

 

doors, storefronts, and/or partitions. This practice

 

assumes a familiarity with preparing a proper and

 

structurally sound opening, proper anchorage and

 

assumes an understanding of the fundamentals of

 

building construction that affect the installation of folding

 

center pivot frameless systems. A crew of at least 2

 

persons is needed. These systems can be heavy. Use safe

 

lifting techniques to avoid injury and product damage.

 

Highly recommended is using a

n independent

 NanaWall 

C

ertified 

I

nstaller, if available, or, at least,

 

an installer 

who has some experience in installing

 

NanaWall

 

systems.

IMPORTANT: 

READ COMPLETE INSTRUCTIONS 

BEFORE BEGINNING INSTALLATION. INSTALL AS 
RECOMMENDED; OTHERWISE, THE UNIT MAY 
NOT FUNCTION PROPERLY AND ANY WARRANTY, 
WRITTEN OR IMPLIED, WILL BE VOID.

CAUTION:  
As regulations governing the use of glazed windows,

 

doors, storefronts

,

 and/or partitions vary widely, it is the

 

r

esponsibility of the building owner, architect, contractor

or installer to insure that products selected conform to all

 

applicable codes and regulations, including federal, state

 

and local. Nana Wall Systems, Inc. can assume no

 

obligation or responsibility whatsoever for failure of the

 

building owner, architect, contractor

,

 or installer to

 

comply with all applicable laws and ordinances and

 

safety 

 

and building codes.

Please  pay  special  attention  to  the  thickness  of  glass. 
The NanaWall glass thickness for the panels is based 

on the Glass Association of North America (GANA) 
recommended minimum glass thickness for fully 
tempered Interior butt glazed fixed glass panels.

The CSW75 system is shipped with all necessary 
components. However, 

not included

 are screws, bolts, 

shims, etc. to anchor the unit to the opening. The frame 
is shipped knocked down and needs to be assembled. 
Panels are usually pre-assembled with glass, ready to be 
attached to the installed frame. In most cases, all rollers, 
pivots, and lockings are pre-attached to the panels.

DESCRIPTION OF SUPPLIED PARTS 

 

First look for an envelope in the shipment, which contains 
drawings of the elevation, the layout of the unit and an 
Installation Manual. This information together with the 
Custom Product Drawings provided by NanaWall at the 
time of order will be needed for a successful installation. 
As there is 

no “standard” configuration

 for CSW75 units, 

see Diagram 1 which shows the elevation and layout 
of a 5 panel unit to illustrate the installation process. 
Some items may not be applicable for your unit. Inspect 
the custom product drawing, indicating size, configuration 
and labeling of the unit ordered. 

Check all parts carefully before assembly. Depending on 
the unit ordered, some of these parts may already be pre-
installed on the panels. 

Check that the sizes of the frame 

components and panels match with what was ordered. 

The elevation drawing shows the sequence and number 
of panels, which depends on the model ordered. 

The drawing is always viewed from the outside, 
but the locking shown is what is on the inside.

 

The panels are usually pre-assembled with one upper 
carrier for each folding panel and with one specified 
locking. 

The sequence of labeling of panels starts from 

the left looking from outside with the left most panel 
labeled Panel #1. 

Содержание CSW75

Страница 1: ...75 Folding Center Pivot Frameless System This manual is to be used by the installer for installation and is to be kept by the Owner for reference Replacement parts can be ordered directly through Nana...

Страница 2: ...ckness for the panels is based on the Glass Association of North America GANA recommended minimum glass thickness for fully tempered Interior butt glazed fixed glass panels The CSW75 system is shipped...

Страница 3: ...anel 1 folding center pivot panel Panel 2 folding center pivot panel Panel 3 folding center pivot panel Panel 4 folding center pivot panel Panel 5 single double action end panel with pivot box or sing...

Страница 4: ...taller than the total unit height depending on how level the support structure above is See Sheet 2 of the Installation Manual It is important that the opening be the correct size Product performance...

Страница 5: ...nd floor sockets in concrete slabs and wood the substrate should be a minimum of 4 thick these components should be fully embedded into the concrete or wood and the clear edge distance in concrete or...

Страница 6: ...ener spacing in the support structure within the opening depends on substrate material design windload pressures if exterior of project panel height and other requirements of the project All anchoring...

Страница 7: ...D Step B1 Check all the carriers on all the folding panels Make sure all the locking nuts are securely tight Do not make any adjustments on the carriers yet Step B2 Before inserting the panels remove...

Страница 8: ...ross the width of the opening and 23 mm 7 8 at the top If the gaps are not correct then adjust the upper track by removing or adding shims above the head track as needed The upper track has to be perf...

Страница 9: ...ing with pivot point the dimension for the center of the pivot axle to the adjacent edge of the panel end cap should be 1 11 16 43 mm plus the additional 3 16 4 mm for the gap to the wall Please check...

Страница 10: ...chisel out the concrete to recess the floor closer into the floor Make sure that the full underside of the box rests on a flush and level surface and fix it temporarily into place Then install the top...

Страница 11: ...oint of the pivot panel use suitable material to finally fix the floor closer in place Before you put on the cover for the floor closer make sure to measure how much to cut off to make it fit with the...

Страница 12: ...nt where the hinge part with hinge pin is located in your direction The panels fold together and you can push them gently from the side using both hands 4 Note that there is a carrier at each upper ce...

Страница 13: ...cally check for worn or damaged components and replace as soon as possible A unit with nonworking components will subject the other components to increased stress and lead to premature failure A unit...

Страница 14: ...s thickness and specifications will be needed Depending on the model widths of frameless all glass panels may not be equal Ask NanaWall for the glass dimensions Please note that glass is required to b...

Страница 15: ...ance For Coastal Salt Water and Other Extreme Environments included in the Owner s Manual for each Product and is available for review on NanaWall s website is properly implemented and documented An E...

Страница 16: ...ent part or product is not commercially practicable NanaWall may elect to refund the purchase price of the affected product in full satisfaction of its obligations Wood Wood components must be properl...

Страница 17: ...application storage handling modification or waterproofing Movement of surrounding substrates including deflection of the header of more than or any other stresses on product Improper installation fla...

Страница 18: ...tions beyond NanaWall s control Gas fill or retention levels in insulated glass units Field testing of Product Performance of the Product in conformance to any published NanaWall testing results e g a...

Страница 19: ...___________________________________ Project Address if different from above _____________________________________________________________ INSTALLATION Installer Name _______________________________ Ad...

Отзывы: