3D TRASAR
5500 - Installation & Operation Manual
521-OM0108.88
Copyright
2009 Nalco Company
2-19
Technical Help
(630) 305-CHEM
2.4.2 3D TRASAR System Inlet Water Plumbing
!
Plumb using ball valves provided. Inlet
water from recirculating system must be
at 5 GPM or greater.
Outlet
½”
Union
0.5
GPM
Plumb controller
• Required flow rate through the sample piping is 5
gpm total (>0.5 gpm is routed through the Fluorom-
eter and up to 4.5 gpm goes through the sensors).
• Plumb the 5 gpm sample water to the inlet ball valve
(¾” female NPT).
• Maximum inlet water pressure should not exceed 90
psig.
• Inlet water temperature should be between 40 and
120 deg F.
Note
: If the required 5 gpm flow cannot be achieved through normal system operating
pressures, a booster pump may be needed to increase the flow rate.
IMPORTANT
: If a booster pump is used, it is important to make provisions to Interlock the
3D TRASAR system with the operation of the cooling system. In the event that the cooling
system SHUTS DOWN the booster pump may continue to supply sample water to the 3D
TRASAR system. In this case, all controlling relays will continue to function causing an
overfeed of chemical or excessive blowdown. Refer to Section 2.7.14 for System Interlock
wiring details.
Inlet Ball Valve
Содержание 3D TRASAR Series
Страница 51: ......
Страница 202: ...Model 060 TR5120 88 Pellet Feeder Plumbing Assembly B 10...
Страница 203: ...Model 060 TR5540 88 High Pressure Water Reinjection System B 11...